Cost, complexity and carbon footprint. Earlier this month, Switzerland-headquartered Leclanché launched its new, modular energy storage system solution aimed at reducing all three of these challenging points for the industry. VP for system engineering Daniel Fohr and EMEA region sales and business development manager Cyril Carpentier speak about how and why Leclanché believe LeBlock solves some of the major concerns energy storage developers face.
California governor Gavin Newsom has tabled a revision to the US state’s budget which would put US$100 billion into economic recovery, including US$912 million to accelerate progress on climate change mitigation through the energy sector and US$3.2 billion for zero emissions vehicles support.
A 99.9MW energy storage project in development in northern England by Renewable Energy Systems (RES) has secured planning permission, with the asset set to be operational in late 2023.
Long-duration zinc battery energy storage system maker Eos Energy Enterprises’ order book, backlog and sales pipelines have greatly increased, but the company has also incurred significant costs as it puts in efforts to reach scale in manufacturing and deployments.
A rapid and significant increase in battery storage capacity will be among factors contributing to an improved energy security position for California’s electricity networks this summer, but the grid is still vulnerable to stress during any extreme heatwaves.
Australian flow battery energy storage company Redflow has entered a “high voltage, high capacity grid-scale future,” unveiling a new system it has created to be deployed at a 2MWh project in California.
Construction has begun on more than a gigawatt of large-scale renewable energy projects with battery storage attached in Texas, by Enel Green Power North America, the regional renewable and clean energy arm of European utility Enel.
A massive “green hydrogen hub” adjacent to a coal power plant in Utah could get over half a billion dollars in US government loans to support its development.
US Trade and Development Agency (USTDA) funding has been allocated to feasibility studies for large-scale battery storage projects co-located with wind power in Senegal, west Africa and Mozambique, in southeastern Africa.