Lightsource BP switches on first battery project from ‘multiple-gigawatt global pipeline’ in UK

By George Heynes
LinkedIn
Twitter
Reddit
Facebook
Email

Solar developer Lightsource BP has energised its first UK-based battery energy storage system (BESS) – the first of its global multi-gigawatt pipeline.

The two-hour duration 25MW/50MWh Tiln BESS is co-located with Lightsource BP’s 61MWp solar farm situated in Lincolnshire, a region of the UK that has seen growing interest for large-scale solar-based national significant infrastructure projects (NSIPs).

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Lightsource BP disclosed that the solar and battery assets share grid connection infrastructure and will participate in both traded markets and the provision of ancillary services. The developer did not confirm who had supplied the BESS for the project.

Miguel Vega, director of business development, EMEA, at Lightsource BP suggested that energy storage can “help renewable energy take a central role in the world’s electricity network”, adding that it is “imperative that renewables, with solar at the forefront, are established as the backbone of low-carbon energy systems”.

It has been a busy few months for Lightsource BP, with the company fully acquired by oil and gas giant BP in late November 2023 via the acquisition of the remaining 50.03% stake.

To read the full version of this story, visit Solar Power Portal.

Energy-Storage.news’ publisher Solar Media will host the 9th annual Energy Storage Summit EU in London, 20-21 February 2024. This year it is moving to a larger venue, bringing together Europe’s leading investors, policymakers, developers, utilities, energy buyers and service providers all in one place. Visit the official site for more info.

17 June 2025
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 17-18 June 2025, will be our fourth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2026 and beyond.
1 July 2025
London, UK
UK Solar Summit 2025 will look at the role solar currently plays in the energy mix, how this will change over the coming years and how this aligns with net-zero and other government targets. We will break down all these challenges and help build up solutions through discursive panels, motivational keynotes and case studies, with newly added interactive sessions to get you moving and meeting your peers, making the connections you need to boost your business.

Read Next

Premium
April 29, 2025
A handful of successful applicants to Ontario’s largest-ever energy storage procurement are receiving heightened backlash from local opposition over their plans. 
April 25, 2025
Adani Green Energy subsidiary has signed a power purchase agreement with Uttar Pradesh Power Corporation Limited for a pumped hydro facility.
Premium
April 23, 2025
A panel of owner-operators, optimisers and developers discussed the evolving dynamics of the ERCOT, Texas market at last month’s Energy Storage Summit USA 2025 in Dallas.
April 22, 2025
Energy storage owner-operator BW ESS and Zelos Energy Developments have announced a 1.5GW pipeline of BESS projects in Germany, aiming for ready-to-build (RTB) status over the next two years. 
April 22, 2025
ACE Power has submitted a 2,000MWh BESS in Queensland to Australia’s Environment Protection and Biodiversity Conservation (EPBC) Act.

Most Popular

Email Newsletter