India’s SECI tendering for 100MW solar with battery storage in Andhra Pradesh

August 10, 2016
LinkedIn
Twitter
Reddit
Facebook
Email

Storage will become increasingly important in India as the rapid uptake of solar energy exerts strain on the grid. Flickr: Pranav
Solar Energy Corporation of India (SECI) has issued a request for selection (RfS) for 100MW of grid-connected solar PV projects with large-scale battery energy storage systems at Kadapa Solar Park, Andhra Pradesh.

The tender will be part of the National Solar Mission (NSM) Phase II, Batch IV, Tranche V.

In July, PV Tech reported that SECI would soon be tendering for utility-scale solar-plus-storage projects with 100MW in Andhra Pradesh and 200MW in Karnataka, with each 50MW project connected to 2.5MWh of storage capacity.

Storage will become increasingly important in India as the rapid uptake of solar energy exerts strain on the grid.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Read Next

February 20, 2026
A flurry of BESS project news from big-name players in Western Europe in the run-up to the Energy Storage Summit next week, with Neoen, Statkraft, Zenobē and Infranode moving projects forward in Germany, Ireland, the UK and Denmark. Highlights include a 15-year toll between Drax and Zenobē, and multiple 4-hour duration systems.
February 20, 2026
Recent developments from India’s emerging energy storage sector highlight a broadening of interest in diverse technologies and applications.
February 18, 2026
The US Treasury’s interim FEOC guidance has outlined “Material Assistance” provisions, which rely heavily on existing safe harbour calculations.
February 12, 2026
Two BESS projects in Yuma County, Arizona, one from BrightNight, and one from Leeward Renewable Energy, have reached significant milestones.
February 11, 2026
Energy storage developer NineDot Energy closes US$431 million in construction financing for New York BESS projects. Meanwhile, US energy efficiency and renewables company Ameresco completes multiple tax credit transfer and financing transactions for solar PV and BESS.