India’s SECI tendering for 100MW solar with battery storage in Andhra Pradesh

LinkedIn
Twitter
Reddit
Facebook
Email

Storage will become increasingly important in India as the rapid uptake of solar energy exerts strain on the grid. Flickr: Pranav
Solar Energy Corporation of India (SECI) has issued a request for selection (RfS) for 100MW of grid-connected solar PV projects with large-scale battery energy storage systems at Kadapa Solar Park, Andhra Pradesh.

The tender will be part of the National Solar Mission (NSM) Phase II, Batch IV, Tranche V.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

In July, PV Tech reported that SECI would soon be tendering for utility-scale solar-plus-storage projects with 100MW in Andhra Pradesh and 200MW in Karnataka, with each 50MW project connected to 2.5MWh of storage capacity.

Storage will become increasingly important in India as the rapid uptake of solar energy exerts strain on the grid.

31 October 2025
Greater Noida, India

Read Next

Premium
June 12, 2025
In this blog, ESN Premium speaks with Fluence’s Rob Hills and Sam Markham about hybrid assets and trends in Australia’s NEM.
June 11, 2025
India’s Ministry of Power has significantly increased the size and scope of its Viability Gap Funding (VGF) scheme to support battery storage projects.
June 10, 2025
India Energy Storage Alliance president Debmalya Sen takes a comprehensive look at national and regional efforts to promote and deploy much-needed energy storage capacity.
June 10, 2025
Australia’s Victoria government has fast-tracked a 400MWh battery energy storage system (BESS) and 500MW solar-plus-storage project via its Development Facilitation Program (DFP).
June 6, 2025
Wisconsin’s first large-scale battery energy storage system (BESS) project, the 110MW Paris Solar-Battery Park, has come online.

Most Popular

Email Newsletter