The Energy Storage Report 2024

Now available to download, covering deployments, technology, policy and finance in the energy storage market

First DC-coupled grid-scale battery storage system in UK begins construction from GE

LinkedIn
Twitter
Reddit
Facebook
Email
Image: GE Renewable Energy.

The UK’s first DC-coupled battery energy storage system is under development in a collaboration between GE Renewable Energy and engineering company Wykes.

GE Renewable Energy was chosen by Wykes to deliver the 25MW multiple hour duration energy storage systems, which will be integrated with Wykes’ 60MW solar PV plant at the Chelveston Renewable Energy Park.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The site also has 26MW of wind energy, with Wykes intending to use the storage to add another 60MW of solar capacity, taking total renewable capacity to 146MW.

The company is lauding it as the UK’s first direct-DC-coupled solar deployment where the solar and batteries share a common set of power conversion equipment. This, Wykes said, will help improve overall energy output of the hybrid system while also optimising costs and increasing system reliability and flexibility.

To read the full version of this story, visit Solar Power Portal

Read the October 2019 feature article: 'Go big, go DC: an in-depth look at DC-coupled solar-plus-storage'. 

Email Newsletter