Continental Europe’s biggest battery system inaugurated by Corsica Sole in Belgium

LinkedIn
Twitter
Reddit
Facebook
Email

A 50MW/100MWh battery energy storage system, the largest in continental Europe, has been inaugurated in Belgium by developer Corsica Sole.

The system in the French-speaking region of Wallonia came online last week (1 December), and is the first of three 100MWh projects in Belgium that have been slated to come online before the end of the year (more details further down).

The project’s development was led by Corsica Sole, while developers Yuso and InnoVent were project partners. EV and energy storage firm Tesla provided its MegaPack utility-scale battery storage product for the system (pictured), which is in the district of Deux-Acren.

The system will help to ensure the stability of frequency in the European electricity network. The main way battery systems do this is through participating in Frequency Control Reserve (FCR), which will be gradually replaced by a pan-European service called automatic frequency restoration reserve (aFRR).

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

As well as helping to regulate the frequency of the grid, the system will mitigate the intermittency of renewable energy sources by providing load shifting services.

Developer Yuso, one of the project partners in the Wallonia project, is also involved in the development of another 100MWh system in Belgium, providing optimisation services under a 10-year deal. That four-hour system (25MW power) is set to come online before the end of the year, while another 25MW/100MWh system from commodities trading company Trafigura in the municipality of Balen was also slated to come online in 2022.

Corsica Sole said the project totalled €33 million (US$34.7 million) of investment.

“This project is an important step for the development of electricity storage solutions in Europe,” said Michael Coudyser, managing director of Corsica Sole.

“We financed this project with our shareholder Mirova Energy Transition 5 without having recourse to any public subsidy. By demonstrating that the large-scale deployment of batteries is economically viable, we provide proof that we can build a world based on renewable energy coupled with energy storage.”

The Paris-headquartered firm has previously completed storage systems on the Mediterranean island of Corsica, an overseas territory of France, as previously reported by Energy-Storage.news. Asset manager Mirova acquired a stake in the firm in April 2021.

Energy-Storage.news’ publisher Solar Media will host the eighth annual Energy Storage Summit EU in London, 22-23 February 2023. This year it is moving to a larger venue, bringing together Europe’s leading investors, policymakers, developers, utilities, energy buyers and service providers all in one place. Visit the official site for more info.

Read Next

June 30, 2026
Axpo and e-Storage have partnered on a BESS in southern Italy, RES Group has signed a full-scope battery asset management agreement in Sweden, while R.Power has agreed to sell a Poland BESS project to Engie.
June 26, 2026
Energy Dome has signed its second low-carbon energy supply contract with Google.
June 25, 2026
US residential solar and energy storage installer Sunrun, energy management platform Renew Home, and Tesla have announced an agreement to deliver more than 16GW of flexible energy capacity to US hyperscalers and utilities.
June 24, 2026
NatPower and Tesla have signed a multi-year supply and execution agreement covering more than 25GWh of BESS across Italy and the UK.
June 24, 2026
Germany’s policymakers, regulators and energy storage industry must carefully consider the issues of grid connections and grid fees, writes Thomas Antonioli of developer Terra One.