Australian transmission operator’s commercial arm to tender for 300MW unsubsidised battery project

July 6, 2021
LinkedIn
Twitter
Reddit
Facebook
Email
Lumea is already building a 50MW / 75MWh project in Western Sydney using Tesla Megapacks. Image: Tesla.

Infrastructure service provider Lumea has opened up a process to tender for a 300MW grid-connected battery project near Melbourne, Australia, intending to build the project without government funding.

A selective Expression of Interest (EOI) process opened up yesterday for the battery energy storage system (BESS) which will be connected to Deer Park Energy Hub, a transmission infrastructure site on the western outskirts of metropolitan Melbourne, in the state of Victoria.

The system will operate in the National Electricity Market (NEM), which interconnects five of the main jurisdictions of Australia and has operated as a wholesale market since the late 1990s. As such it offers opportunities for batteries and other energy assets to earn revenues from providing grid services, coupled with the pressing need and growing trend for the addition of renewable energy resources.

Through the EOI, Lumea will create a process for selecting between applicants from renewable generation and wider energy sector companies. The company said in a press release that the EOI will gauge market interest in the project and will be used to determine the optimal size and duration of storage of the BESS.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The company will also examine what sort of future opportunities could open up in the NEM — for example there are currently plans to launch a wider suite of frequency control ancillary services (FCAS) market opportunities than the already-lucrative opportunities that currently exist. Meanwhile the BESS will also enable the optimisation of renewable energy assets, storing power for dispatch when most needed, as well as providing stability through grid services.

Deer Park is an important asset for Melbourne’s electricity supply and is owned and operated by TransGrid, one of Australia’s main high voltage transmission network operators, responsible for 13,000km high voltage lines, cables and substations in New South Wales (NSW) and the Australian Capital Territory (ACT). TransGrid was granted a transmission license from the Deer Park site in 2017.

TransGrid launched Lumea as its commercial project arm in May this year, tasked with capturing the value of providing services to Australia’s renewables industry, and at the time of the launch already held a portfolio of over 9,000MW of renewable energy projects in operation or under construction. Lumea also provides secure power to large commercial, industrial and infrastructure users of electricity as well as working in the energy storage, transport and essential services sectors.

“Lumea is looking to demonstrate that batteries can be fully funded through the market. We know that the energy transition requires innovative pathways to reach its renewable targets,” Lumea head of infrastructure Nigel Buchanan said.

“It is critical we also find new avenues to fund these projects through the market to allow the most effective use of all funding sources for lower cost energy.”

In October last year, Energy-Storage.news reported that TransGrid would trial the use of a 50MW / 75MWh grid-scale BESS, using Tesla’s Megapack grid-scale storage solution product at one of its substations in Wallgrove, Western Sydney, NSW, to provide services including synthetic inertia and frequency response. Lumea said yesterday that it is now taking on that project and it is on track for completion in October. Unlike the private funding that it is hoping to achieve at the Deer Park Battery, Wallgrove project is receiving AU$21.5 million (US$15.35 million) from federal and state government to support its expected AU$61 million total cost.

Read Next

November 3, 2025
The Victoria government in Australia has approved a 300MW/1,200MWh BESS in Gippsland and a 332MW solar PV power plant with integrated storage in the state’s northeast region.
November 3, 2025
Battery storage capacity in Australia’s National Electricity Market (NEM) expanded by 2,936MW/6,482MWh over the 12 months leading to the end of Q3 2025.
November 3, 2025
A “silver buckshot, not a silver bullet” has emerged as the rallying cry for Australia’s energy storage, said Paul Hunyor of Wollemi Capital.
October 31, 2025
Developer Eku Energy and LP Renewables have announced plans for the 400MW/1,600MWh Belah battery energy storage system in Queensland, Australia.
Premium
October 31, 2025
The Australian Parliament has received the Environment Protection and Biodiversity Conservation (EPBC) Act reform bills, marking the government’s latest attempt to overhaul environmental legislation that has faced criticism for delaying renewable energy projects and contributing to biodiversity decline.

Most Popular

Email Newsletter