Younicos, Panasonic and utility Xcel Energy partner on solar storage system in Denver

November 1, 2016
LinkedIn
Twitter
Reddit
Facebook
Email

The system will be developed at the operations hub for Panasonic Enterprise Solutions Company and Panasonic CityNOW in Denver. Image: Panasonic
Energy storage system integrator Younicos has signed off on a deal with Panasonic to design and develop a solar-plus-storage system at Peña Station NEXT in Denver, Colorado, which includes the operations hub for Panasonic Enterprise Solutions Company and Panasonic CityNOW.

The installation will utilise multiple Younicos Y.Cubes, a “storage-in-a-box” solution for C&I applications from the German-American industry company. Y.Cube includes power conversion system and DC battery block, with controls embedded in the power conversion system. The systems are available in 250kVA to 500kVA configurations.

The project will see four Y.Cubes installed at the Panasonic facility in Denver, Colorado. The 1MW storage system, which will be connected to Xcel Energy’s power grid, will offer frequency regulation, solar grid integration through ramp control, grid peak shaving, passive energy arbitrage, and backup power. This system will allow Panasonic and other microgrid stakeholders to gain maximum energy yield from Xcel Energy’s 1.6 MW solar PV system located on a nearby parking structure, along with 259 kW of PV on the building’s rooftop.

Jamie Evans, managing director of the energy solutions group at Panasonic Enterprise Solutions Company, said: “The solar-plus-storage microgrid is an anchor, not just of Panasonic’s new Denver operations hub, but also for the broader Peña Station NEXT development, which is a 400-acre, smart and sustainable transit-oriented development in Denver. We are excited to partner with Younicos and Xcel Energy to bring this innovative project to life.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Younicos Y.Cube storage system. Image: Younicos.

Read Next

February 12, 2026
Two BESS projects in Yuma County, Arizona, one from BrightNight, and one from Leeward Renewable Energy, have reached significant milestones.
February 12, 2026
A 582MWh battery storage project and a gigawatt-hour-scale thermal energy storage system are the latest big developments in the emerging Baltic region, north-eastern Europe.
February 11, 2026
Energy storage developer NineDot Energy closes US$431 million in construction financing for New York BESS projects. Meanwhile, US energy efficiency and renewables company Ameresco completes multiple tax credit transfer and financing transactions for solar PV and BESS.
February 9, 2026
Software-focused battery energy storage system (BESS) integrator FlexGen has put two utility-scale BESS projects in operation in Wisconsin and Iowa, US, totalling 700MWh.
February 9, 2026
Chinese battery manufacturer EVE Energy has secured a contract with the Malaysian government to deploy an AC/DC integrated 36MWh solar-plus-storage system at Kuala Lumpur International Airport (KLIA).