US government ramps up battery supply chain support with US$3.1 billion funding opportunity

May 3, 2022
LinkedIn
Twitter
Reddit
Facebook
Email

The US Department of Energy (DOE) has formally launched a US$3.16 billion grant funding opportunity for its domestic battery supply chain, the latest in a series of moves to support the sector.

The funding opportunity announcement (FOA) is made up of two parts and an approximate launch date has been known since February this year, as reported by Energy-storage.news.

‘Battery Materials Processing and Battery Manufacturing’ is the bulk of the money and will go towards projects to build, retrofit or expand battery material processing or component manufacturing and recyling facilities. The submission deadline for letters of intent (LOI) and full applications are May 27 and July 1st this year, respectively, with award negotiations expected to take place between October and April 2023.

The second, ‘Electric Drive Vehicle Battery Recycling and Second Life Applications’, will support second-life applications for EV batteries and new processes for recycling materials back into the supply chain. LOIs are due May 31 and full applications by July 19, with the same timeframe for negotiations as the previous FOA.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

US Secretary of Energy Jennifer M. Granholm said: “President Biden’s historic investment in battery production and recycling will give our domestic supply chain the jolt it needs to become more secure and less reliant on other nations—strengthening our clean energy economy, creating good paying jobs, and decarbonising the transportation sector.”

The Biden administration wants to domesticate more of the global battery supply chain onto US shores as well as make EVs account for half of vehicle sales by 2030. EVs were only 8% of sales last year – 3% pure EVs and 5% hybrids – according to Reuters while the US’ percentage share of the lithium-ion battery manufacturing market is in single digits.

This FOA launch date was announced prior to the government’s recent invocation of the Cold War-era Defense Production Act (DPA) to boost the domestic battery supply chain on March 31, and is therefore unrelated. A number of sources told Energy-storage.news at the time that the DPA would only help to solve supply chain issues over the longer term.

More details on the funding opportunities can be found on the DOE’s Energy Efficiency & Renewable Energy website here. The FOA is not the only funding the DOE is providing for the country’s battery supply chain, all of which stems from the historic Bipartisan Infrastructure Deal passed in November 2021 by Congress, the legislative assembly of the federal government.

Last week, the DOE’s Loan Programs Office (LPO) committed over US$600 million for a green hydrogen storage project in Utah and a battery graphite production facility in Louisiana.

As of March, the LPO was processing over US$10 billion in loan applications for battery manufacturing plants. In the last two months, plans have been announced to build lithium-ion gigafactories for stationary energy storage by domestic startups ABF and SPARKZ as well as a Turkish company with a track record back home. In January, Battery Resourcers (since renamed Ascend Elements) announced plans to build what it claimed will be the largest lithium-ion battery recycling facility in North America.

24 March 2026
Dallas, Texas
The Energy Storage Summit USA is the only place where you are guaranteed to meet all the most important investors, developers, IPPs, RTOs and ISOs, policymakers, utilities, energy buyers, service providers, consultancies and technology providers in one room, to ensure that your deals get done as efficiently as possible. Book your ticket today to join us in 2026!
15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Read Next

Premium
January 22, 2026
Foreign entity of concern (FEOC) restrictions and the scheduled Section 301 tariff increase to 25% on Chinese-origin battery energy storage systems (BESS) went into effect on 1 January 2026.
January 21, 2026
Virginia’s recently proposed legislation to significantly increase energy storage requirements coincides with unprecedented electricity demand growth in the state, largely driven by data centres.
January 20, 2026
Year in Review series perspectives, from FEOC to data centres, from Vaughn Morrison, partner at US law firm Troutman Pepper Locke.
January 19, 2026
FranklinWH and ConnectDER have had their respective battery and electric meter technologies enrolled into programmes in Arizona expected to accelerate the take-up of home batteries for virtual power plants (VPPs).
Premium
January 19, 2026
US-based iron-sodium battery manufacturer Inlyte Energy has successfully completed a factory acceptance test of its first field-ready battery at its facility near Derby, UK, witnessed by representatives from US utility Southern Company.