US cell manufacturer KORE Power wins 20MWh UK battery storage project supply deal

By Alice Grundy
June 16, 2022
LinkedIn
Twitter
Reddit
Facebook
Email

Battery cell manufacturer KORE Power is to provide the batteries for a 10MW/20MWh battery storage project under development between ABB and green energy supplier Ecotricity in the UK.

The battery energy storage system (BESS) will be installed at Ecotricity’s existing 6.9MW wind farm in Gloucestershire, England, in 2023, with KORE to supply its Mark 1 energy storage modules equipped with its high energy density NMC pouch technology. The Mark 1 system is fully certified under UN 38.3, UL 1973 and IEC 62619 and achieved UL 9540A.

KORE said the project represents a key step for the company in the “rapidly growing UK market”. KORE itself is headquartered in the US, where it’s currently building a battery cell gigafactory with a 12GWh annual production capacity. Located in Arizona, the gigafactory will add to a ramp up of KORE’s existing factory in China from 2GWh to 6GWh.

The company also recently launched a full service storage integrator division – KORE Solutions – with the acquisition of existing provider Northern Reliability.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

ABB’s eStorage MAX BESS in Gloucestershire is to be integrated with Ecotricity’s Smart Grid platform, using the company’s proprietary optimisation model to dispatch the battery energy storage according to system needs.

The project is to provide both a material addition to the company’s renewable energy offering and also highlight the potential of short-term fast response technologies such as BESS to add additional stability to the national grid, KORE said.

“We share the vision of ABB and Ecotricity that renewable, reliable energy is the smart choice for business and for the planet,” said Lindsay Gorrill, co-founder and CEO of KORE Power. “This project demonstrates that our clean energy future has arrived.”

This story first appeared on Solar Power Portal.

13 October 2026
London, UK
Now in its second edition, the Summit provides a dedicated platform for UK & Ireland’s BESS community to share practical insights on performance, degradation, safety, market design and optimisation strategies. As storage deployment accelerates towards 2030 targets, attendees gain the tools needed to enhance returns and operate resilient, efficient assets.

Read Next

Premium
March 5, 2026
In this second part of our interview with Wood Mackenzie energy storage analysts, we look at risk factors and mitigation across the European and US markets.
Premium
March 4, 2026
We heard from Danske Commodities’ principal originator Rimshah Javed at the Energy Storage Summit 2026, to discuss trends in BESS offtake, optimisation, FCAs in Germany and the Danish market. The latter has taken off in the past year.
March 3, 2026
A second-round auction in the UK for grid stability services, including inertia, concluded without any wins for grid-forming battery energy storage system (BESS) projects.
March 3, 2026
Allianz GI, Luxcara and Return have acquired BESS projects and portfolios in Germany, Finland and Spain; Low Carbon, OX2, Cero Generation and Revera have taken FIDs on projects in Poland, Finland and the UK; and NHOA Energy has received a 600MWh order in Italy. All in all, the projects total at least 3.7GWh of capacity.
Premium
February 27, 2026
We caught up with the CEO of owner-operator BW ESS, Erik Strømsø, about the firm’s next deployment plans, tolling trends, procurement and LDES, with its 11.5-hour Bannaby BESS in Australia further proof of lithium-ion’s long-duration potential.