Dallas, Texas-based independent power producer (IPP) Stellar Renewable Power has secured a Special Use Permit (SUP) to construct and operate a 1GW/4GWh BESS project co-located with a 1GW solar farm in Navajo County, Arizona.
The US battery storage system integrator arm of Korean battery manufacturer LG Energy Solution (LG ES) has signed a 4-year supply deal with developer Terra-Gen.
Canada’s Capstone Infrastructure and Denmark’s Eurowind Energy are proposing to construct a 400MW/3200MWh standalone BESS in Alameda County, California.
Philippines President Ferdinand ‘Bong Bong’ Marcos Jr has attended the inauguration of the country’s first lithium iron phosphate (LFP) battery factory.