fire suppression

July 29, 2020
An April 2019 fire and subsequent explosion which caused injuries to firefighters and destruction of a grid-scale battery storage system in Arizona likely started with an internal cell defect that caused the “preventable” incident, analysis has found.
May 29, 2020
Battery energy storage deployed at Cleve Hill, the largest solar farm planned in the UK to date, will be installed and operated in line with a safety plan agreed with local fire services and the national Health and Safety Executive.
September 12, 2019
The second draft of the US National Fire Protection Association (NFPA) energy storage system guidance on fire hazards and safe installation best practices for stakeholders has been published.

Most Popular

Upcoming Events

June 30
 - July 1
, 2026
Novotel London West, London, UK
June 30
 - July 1
, 2026
Sacramento, California
July 1
 - July 3
, 2026
Bangkok, Thailand
July 8
 - July 8
, 2026
9am PDT / 5pm BST
August 25
 - August 26
, 2026
Sydney, Australia