Tesla said that it more than doubled production volumes of grid-scale energy storage solution Megapack in the third quarter of 2020 as the company continues to ramp up production to “match unprecedented demand across the globe”.
The first phase of a 1,000MW behind-the-meter virtual power plant (VPP) is expected to begin deployment in Australia as soon as the state of Victoria’s COVID-19 lockdown is over.
Energy storage technology provider and system integrator Fluence has acquired Advanced Microgrid Solutions, the California company known for its artificial intelligence (AI)-driven optimisation software platform for energy storage and flexible generation assets.
Dr Kai-Philipp Kairies, a battery scientist and CEO of battery software start-up ACCURE, spoke to Andy Colthorpe about how his company aims to be a ‘software-as-a-service’ provider in negotiating the complexity of managing batteries.
In this final piece of in-depth Battery Day coverage, let’s take a closer look at the technology, manufacturing techniques and value chain improvements Elon Musk and Drew Baglino talked about.
Peaxy CEO and President Manuel Terranova joins us to discuss some of the biggest challenges facing the battery industry, and how smart software like Peaxy Lifecycle Intelligence (PLI) for Batteries can solve them.
New software solutions aimed at streamlining the process of deploying commercial and industrial (C&I) energy storage and for correctly sizing energy storage for distributed solar have been launched in the US.
South Somerset District Council (SSDC), a local government authority in the UK, is to build its second grid-scale battery storage project, announcing a 40MW facility that will be located near Fareham in Hampshire, southern England.
Reports into the performance of two large-scale battery energy storage systems (BESS) in the Australian state of Victoria have been published, showing that both performed as expected, or better, in 12 months of operation.
The largest battery storage project to be owned by a local government authority in the UK, the 30MW Fideoak project, required a novel software solution to ensure that the best return and maximum impact could be made with public money invested, as Thomas Jennings of Kiwi Power explains.