SolarCity picks Tesla for 52MWh of dispatchable solar-plus-storage in Hawaii

LinkedIn
Twitter
Reddit
Facebook
Email

Artist’s impression of Tesla’s utility-scale storage systems. Image: Tesla.
SolarCity has chosen Tesla to supply a 52MWh utility-scale energy storage system, which will make the output of a solar farm in Hawaii dispatchable.

The project, on the island of Kauai, will help local utility Kaua’i Island Utility Cooperative (KIUC) meet evening peak demand which takes place from 5pm to 10pm each night. It will be located at a 12MW solar farm, which presently supplies around 5% of the island’s electricity.

When first announced, Energy Storage News, along with others, speculated that Tesla, affiliated to SolarCity partly through CEO Elon Musk being cousin to SolarCity executives Lyndon and Peter Rive as well as sitting on the SolarCity board of directors himself, might be involved in supplying storage systems.

However, SolarCity said today that Tesla’s proposal was chosen by “comprehensive competitive solicitation of the battery marketplace”.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The solar farm and storage combined will help KIUC further reduce fossil fuel use. SolarCity said it would charge the utility US$0.145 per kilowatt-hour for power from the batteries in a 20-year arrangement.

The project awaits approval from the state’s regulator, the Public Utilities’ Commission. SolarCity and KIUC asked last year for permission to accelerate development, so that it could begin by April this year, when existing ITC (investment tax credit) rates were due to drop.

Read Next

June 5, 2026
Developer EDF power solutions North America and developer-operator Abu Dhabi Future Energy Company – Masdar, have entered into 15-year power purchase agreements (PPAs) for a California, US solar-plus-storage project.
June 2, 2026
Solar PV solutions provider Nextpower has entered into a definitive agreement to acquire BESS system integrator Prevalon Energy for up to US$365 million.
June 1, 2026
Mexico’s Ministry of Energy (SENER) has launched a new call for renewable power projects including generating and energy storage assets.
May 26, 2026
Mining giant Fortescue has commenced construction on a 650MWh battery energy storage system at Cloudbreak in Western Australia’s Pilbara region, alongside the 690MW Turner River solar PV power plant.
May 25, 2026
The US installed 9.7GWh of new battery energy storage system (BESS) capacity, according to the US trade association group, the Solar Energy Industries Association (SEIA).