US Navy plans to build 44MW solar-plus-storage project in Kauai

LinkedIn
Twitter
Reddit
Facebook
Email

Kauai, Hawaii. Flickr user: tdlucas
The US Navy plans to develop a utility-scale solar farm and energy storage system on the 863.6 hectare Pacific Missile Range Facility on the island of Kauai, Hawaii, according to a draft environmental assessment.

The solar PV system would generate 44MW of clean energy into the Kauai Island Utility cooperative’s grid for use by the public and the military. It will be constructed over two phases of 21MW and 23MW respectively, expecting to break ground in December. Details about the energy storage part of the project were not detailed in the assessment.

However, it did say that the batteries would be used to store solar power generated during the day for use at night and further reduce the need for the island’s expensive diesel generators and provide stable generation. Together, the solar and storage would provide electricity in the event of a power outage, as well as help reach the Navy’s renewable energy goals.

This project is reportedly one of three solar-plus-storage offerings to be built under an understanding between the Navy and the California Energy Commission, pursuant to a MoU signed in October.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The islands of Hawaii have an ambitious 100% renewable energy by 2045 plan, with other recently announced projects including a 52MWh utility-scale energy storage system by Tesla-SolarCity and a 20MW, five-hour duration battery energy storage system paired with 28MW of solar by AES, both on Kauai.

3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

October 2, 2026
Outgoing California Governor Gavin Newsom recenty addressed approximately 1,200 bills, including several energy storage and solar related bills that were either approved or vetoed.
September 30, 2026
IPP Northland Power has announced that its 80MW/160MWh Jurassic energy storage project in Cypress County, Alberta, CA, has achieved commercial operations.
September 29, 2026
Olga Sypula, VP and regional director for Central Europe at developer and IPP European Energy, shares her views on the key trends, opportunities and challenges across the Central and Eastern Europe (CEE) energy storage market.
September 28, 2026
Nickel-hydrogen battery company EnerVenue has secured its first commercial order at multi-MWh scale.
September 22, 2026
Residential battery energy storage systems (BESS) across California discharged more than 580MW of peak power to the state’s grid on the evening of 9 September 2026 via a Tesla-Sunrun VPP.