US Navy plans to build 44MW solar-plus-storage project in Kauai

LinkedIn
Twitter
Reddit
Facebook
Email

Kauai, Hawaii. Flickr user: tdlucas
The US Navy plans to develop a utility-scale solar farm and energy storage system on the 863.6 hectare Pacific Missile Range Facility on the island of Kauai, Hawaii, according to a draft environmental assessment.

The solar PV system would generate 44MW of clean energy into the Kauai Island Utility cooperative’s grid for use by the public and the military. It will be constructed over two phases of 21MW and 23MW respectively, expecting to break ground in December. Details about the energy storage part of the project were not detailed in the assessment.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

However, it did say that the batteries would be used to store solar power generated during the day for use at night and further reduce the need for the island’s expensive diesel generators and provide stable generation. Together, the solar and storage would provide electricity in the event of a power outage, as well as help reach the Navy’s renewable energy goals.

This project is reportedly one of three solar-plus-storage offerings to be built under an understanding between the Navy and the California Energy Commission, pursuant to a MoU signed in October.

The islands of Hawaii have an ambitious 100% renewable energy by 2045 plan, with other recently announced projects including a 52MWh utility-scale energy storage system by Tesla-SolarCity and a 20MW, five-hour duration battery energy storage system paired with 28MW of solar by AES, both on Kauai.

Read Next

May 9, 2025
Georgia Power has begun construction on 765MW of new battery energy storage systems (BESS) across Georgia, US.
May 8, 2025
Developer and IPP Leeward Renewable Energy’s (LRE) 88MW/352MWh Chaparral Springs battery energy storage system (BESS) in Kern County, California is now fully operational.
May 8, 2025
7.15GW of renewables and energy storage projects have been granted access rights to connect to Australia’s first REZ in Central-West Orana.
May 7, 2025
AEMO has revealed a big increase in battery energy storage system (BESS) output in Australia’s National Electricity Market (NEM).
April 24, 2025
3.56GW of solar PV, wind generation and BESS have been selected to connect to the South West REZ in New South Wales, Australia.

Most Popular

Email Newsletter