Hawaiian Electric to install 4-hour duration flywheel storage pilot project

LinkedIn
Twitter
Reddit
Facebook
Email

Source: Flickr/Marvin Chandra
Hawaiian Electric has teamed with Californian storage company Amber Kinetics on a 4-hour duration flywheel energy storage pilot project in Oahu.

Amber Kinetics will assume construction and installation responsibilities for the 25-steel flywheel system, which will be located in Hawaiian Electric’s Campbell Industrial Park.

The flywheel, once operational, will be capable of charging and discharging electricity for multiple duty cycles daily. It will also provide renewable firming and peak shifting, flexible capacity and ancillary grid services such as voltage smoothing and frequency response for reliable utility operation. According to Amber Kinetics, the system is capable of supporting unlimited cycling with zero capacity loss during a service life of more than 20 years.

Funding of the project is jointly shared by Hawaiian Electric and Energy Excelerator, US a financier of start-ups in renewable ventures.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

“Hawaiian Electric Company is a leader among US utilities for adopting and integrating renewable energy to create a sustainable energy future. Now it is continuing that leadership by exploring the potential of flywheel energy storage,” said Ed Chiao, Amber Kinetics’ co-founder and CEO. “We are excited to collaborate toward achieving the state’s 100% renewable energy goals by 2045.”

“Energy storage is essential to reach a 100% renewable energy future, optimizing the use of Hawai‘i’s abundant but variable solar and wind energy,” added Shelee Kimura, Hawaiian Electric vice president for corporate planning and business development. “We are collaborating with a variety of partners to test a range of energy storage technologies and we are very excited to work with Amber Kinetics to evaluate this very promising flywheel energy storage system.”

Read Next

August 21, 2025
ACE Power has confirmed the sale of the 103MW/206MWh Kerang grid-forming BESS in the Loddon Valley region of Victoria, Australia.
Premium
August 21, 2025
“It’s the most powerful BESS in the world,” Nick Carter of Akaysha Energy, tells ESN Premium after switching on the Waratah Super Battery in New South Wales, Australia.
August 15, 2025
A 130MWh battery energy storage system owned by the Australian arm of Iberdrola has officially entered AEMO’s Market Management System.
August 13, 2025
Independent power producer (IPP) Africa REN has commissioned a solar and storage project in Senegal, which it claimed as the first of its kind in West Africa.
August 8, 2025
Australian energy major AGL Energy has confirmed that two transformers for the 1,000MWh Liddell battery energy storage system (BESS) in New South Wales have been delivered.

Most Popular

Email Newsletter