Concurrent bidding into multiple merchant markets requires ‘dynamic’ appraisal of income and cycling

By Alice Grundy
March 31, 2021
LinkedIn
Twitter
Reddit
Facebook
Email
Dr. Sudipta Lahiri said there is a “sweet spot” of maximizing expected revenue while maintaining state of health that should be considered in dispatch strategies. Image: DNV

The opening up of independent system operator (ISO) services as a result of FERC Order 841 has led to a “huge difference” in storage dispatch strategy for merchant markets with concurrent bidding now the typical strategy.

This is according to Dr. Sudipta Lahiri, director of storage and grid intelligence for energy systems at DNV, who told audiences at this week’s virtual Energy Storage Summit USA that the FERC ruling has “reduced regulatory risk and increased market access”.

The ruling states barriers to distributed and behind-the-meter energy storage participating in wholesale electricity markets should be removed, ordering regional transmission operators and ISOs to reconfigure wholesale markets to accommodate storage resources to allow them to provide capacity, energy and ancillary services.

Lahiri explained that prior to this, battery projects used to bid into and operate in single merchant markets for example PJM’s Reg D market or CAISO RTE auction markets. Now, following FERC Order 841, the strategy has changed to concurrent bidding and participation in multiple markets, which Lahiri said “essentially requires operators to dynamically evaluate expected income and cycling performance with trade-offs between energy arbitrage and ancillary services participation”.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Indeed, Lahiri said the trade-off between resource operation and resource degradation is “probably the most important and fascinating aspect about estimating storage value”, with this translating to a trade-off between the revenue opportunity and medium to long term O&M costs.

He made reference to how there is generally a “sweet spot” of how much the battery should be operated in a year to maximise the revenue potential. Giving the example of a four hour project in CAISO, he explained that operating the battery at two cycles per day gives an expected revenue of US$5.5 million dollars. If you halve the cycling to one cycle per day, “the expected revenue only drops slightly” to around US$4.5 million dollars.

He said this illustrates that sweet spot of maximizing expected revenue while maintaining state of health, with the sweet spot often sitting around one cycle per day. However, he added that this can depend on “lots of factors” such as how high the merchant market prices are and the cycling and degradation characteristics of a particular cell used in a project.

For hybrid storage projects, dispatch strategy “has to take into account the ramp and sizing limitations of each of the engineering components in the project”. He also gave the example of the different energy transaction paths of a solar-plus-storage project, with these being when the storage is charging off the PV, when the PV is exporting directly to the grid or when the storage is charging from the grid. Each of these paths have a different equivalent efficiency which “require consideration when being scheduled for dispatch”.

Other factors to impact on dispatch include the maximum charge rates, the transformer capacities and inverter limits.

When looking more generally at the merchant market, Lahiri said that merchant market storage project deployment will “continue to drive very high growth in the stationary storage market”, having made reference to how 2020 in particular had been a “fantastic year for energy storage” with the volume installed being greater than all prior years combined.

He finished to state that assessment of project value is “complex”, with there being “multiple revenue streams with different levels of revenue surety” and there always being that trade off between resource operation and resource degradation.

24 March 2026
Dallas, Texas
The Energy Storage Summit USA is the only place where you are guaranteed to meet all the most important investors, developers, IPPs, RTOs and ISOs, policymakers, utilities, energy buyers, service providers, consultancies and technology providers in one room, to ensure that your deals get done as efficiently as possible. Book your ticket today to join us in 2026!
9 June 2026
Stuttgart, Germany
Held alongside The Battery Show Europe, Energy Storage Summit provides a focused platform to understand the policies, revenue models and deployment conditions shaping Germany’s utility-scale storage boom. With contributions from TSOs, banks, developers and optimisers, the Summit explores regulation, merchant strategies, financing, grid tariffs and project delivery in a market forecast to integrate 24GW of storage by 2037.
15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.
15 September 2026
Berlin, Germany
Launching September 2026 in Berlin, Energy Storage Summit Germany is a new standalone event dedicated to Germany’s energy storage market. Bringing together investors, developers, policymakers, TSOs, manufacturers and optimisation specialists, the Summit explores the regulatory shifts, revenue models, financing strategies and technology innovations shaping large-scale deployment. With Germany targeting 80% renewables by 2030, it offers a focused platform to connect with the decision-makers driving the Energiewende and the future of utility-scale storage.

Read Next

March 6, 2026
The Australian government is reportedly exploring additional modifications to its Cheaper Home Batteries Program, including the possibility of an early wind-up, as the government seeks budget savings ahead of the May federal budget.
March 5, 2026
Developer Avantus has closed a financing package of over US$300 million for the 100MWac/130MWdc solar, 400MWh BESS Kitt Solar and Energy Storage Project in Pinal County, Arizona, US.
Premium
March 5, 2026
Energy-Storage.news Premium speaks with Claire McConnell, VP business development for Redwood Materials’ energy storage business, Redwood Energy, about its recent backing from Google and Nvidia, and what it has planned next.
March 5, 2026
From Texas, US, Bimergen Energy has acquired eight BESS projects totalling 79.2MW. Meanwhile, Habitat Energy announced its first US co-located solar-plus-storage partnership with Birch Creek.
March 5, 2026
Jeff Monday of Fluence believes Australia can transform its data centre boom from a grid constraint into a growth opportunity using BESS.