Italy to hold first MACSE energy storage capacity auctions in H1 2025

LinkedIn
Twitter
Reddit
Facebook
Email

Minister of the environment and energy security Gilberto Pichetto has signed a decree allowing Italy to proceed with its energy storage capacity auction, known as MACSE, in the first half of 2025.

Pichetto signed the decree last week (11 October), saying: “Increasing our storage capacity is essential to achieve the objectives of the NECP,” referring to EU member states’ National Energy and Climate Plans (NCEPs), their strategies to achieve EU energy and climate targets by 2030.

“The approval of the regulation marks an important advancement in the new design of the electricity market, focused on the development and integration of renewable sources,” he added.

The MACSE auction will provide 15-year contracts for energy storage projects whereby they will be paid annual premiums to cover operating costs in exchange for making their capacity available on the Dispatching Services Market (acronymised in Italian as MSD). It will be led by transmission system operator (TSO) Terna.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The EU approved a €17.7 billion package to fund the programme in December 2023, and Terna is aiming for it to support the deployment of 50GWh of energy storage by 2030, which is lower than the initial 71GWh forecast.

The first phase of the scheme is specifically targeting lithium-ion battery energy storage system (BESS) projects while a second auction will be carried out for pumped hydro energy storage (PHES) projects, Terna’s two ‘reference’ technologies chosen for their technological and commercial maturity.

The lithium-ion BESS auction could be held as early as the first half of 2025, the Ministry of Environment and Energy Security said.

The auction, and the broader opportunities in Italy’s grid-scale market, were discussed at Solar Media’s Energy Storage Summit EU 2024 in London in February, with panellists calling the MACSE auction “unlike anything we’ve seen elsewhere” (Premium access article).

Consultancy Timera Energy recently said competition in the MACSE auction will be “fierce”, and suggested BESS operators maintain a merchant tranche of their project to offset potentially lower returns on the MACSE contracted tranche.

The main benefit of the MACSE auction is its long-term guaranteed revenues, which can bring banks to the table for financing projects. So far, the only substantial pipeline of BESS projects being built is from utility and independent power producer (IPP) Enel, in which it sold a 49% stake to fund Sosteneo.

The past two years has seen a flurry of BESS development activity from numerous local and international firms, which you can read about by browsing all our coverage of Italy here.

See the full text of the Ministry’s decree (in Italian) here.

3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

Premium
October 15, 2026
How similar is the technology of Exa Energy, which just connected a 100MW/1GWh carbon dioxide-based energy storage system to the grid in China, to that of Energy Dome?  
October 15, 2026
Insufficient progress has been made towards the Energy Storage and Grids Pledge, endorsed by dozens of countries at COP29 two years ago.
October 14, 2026
South Africa continues its push for energy storage capacity, with utility and grid operator Eskom issuing a call to work on a 21GWh pumped hydro energy storage (PHES) project.
Premium
October 9, 2026
Intilion has just tied up with CATL for sodium-ion BESS deployments in Europe, following Alfen’s similar move in July, while Merus Power tells us it is in the process of integrating with the OEM’s new product. 
October 9, 2026
Electrifying low-temperature industrial heat and steam processes with renewables could reduce European Union natural gas consumption by 35 billion cubic metres-per-year, according to a report from the International Energy Agency (IEA).