Location: Pacific Island

Timeline: Phase 1 operation commenced in 2020, Phase 2 operation commenced in 2024.

Capacity: Phase 1 – 1 MW / 2 MWh, Phase 2 – 500 kW / 1000 kWh.

Product: Kehua energy storage PCS solution with 20-foot containers

Application: Microgrid

Introduction

In 2020, a Pacific island microgrid project began its first phase with a capacity of 1 MW/2 MWh, using a Kehua energy storage PCS solution. In 2024, the project was expanded by a capacity of 500 kW/1,000 kWh and officially put into operation. The project, aimed at providing reliable and sustainable power supply to the island, has been running smoothly and efficiently since 2020.

Reliability and Performance

Given the typical challenges faced by microgrid applications in remote locations—such as limited access to resources, unstable power supply and logistical complexities—Kehua provided its advanced solutions through factory prefabrication and pre-testing, combined with integrated container delivery. This approach significantly enhanced transportation and installation efficiency while lowering costs, with the innovations set to empower remote communities with reliable and sustainable energy solutions. Kehua’s advanced technology and robust design have contributed to the seamless operation of the energy storage system, meeting the demanding requirements of the microgrid application.

Customer Recognition

Kehua’s energy storage PCS solution has received positive feedback from the customer for its reliability and performance. The customer’s choice to once again partner with Kehua for the project expansion underlines the strong level of trust existing between the parties, reinforcing Kehua’s status as a highly reliable expert and supplier.

Efficient Service Team

In addition to the superior technology and product performance, the timely assistance and expert guidance from Kehua’s service team have further strengthened the customer’s confidence in the company as a reliable partner for its energy storage needs.

Conclusion

The successful implementation of the Pacific Island microgrid project stands as a testament to Kehua’s commitment to reliability, performance and customer satisfaction. The smooth operation of the system since the commencement of its Phase 1 in 2020, coupled with the customer’s trust in Kehua for ongoing project expansion, highlights the company’s position as a leading supplier of energy storage solutions. 