Galp building 73MW/147MWh of grid-forming BESS in Spain and Portugal with Sungrow tech

August 4, 2025
LinkedIn
Twitter
Reddit
Facebook
Email

Oil, gas and renewables firm Galp has announced construction on BESS projects in Spain and Portugal using equipment from inverter and BESS firm Sungrow.

The firm has launched construction on the five battery energy storage system (BESS) projects totalling 74MW/147 MWh which will connect to solar facilities, it announced yesterday.

Four projects in Portugal totalling 60.5MW/120.4MWh will connect to Galp’s Alcoutim solar farms and will be part-financed by the government’s €100 million (US$115.6 million) scheme, funded by the EU’s Recovery and Resilience framework.

Those projects will build on an existing 5MW/20MWh project that was completed earlier this year, pictured above and deployed by system integrator Powin, an Oregon-based company which is now in administration.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

In Spain, Galp will install a 14MW/28 MWh BESS at a solar PV plant in Manzanares, in the Castilla-La Mancha region.

The operation and optimization of the BESS projects will be directed by Galp’s Control Center, a dispatch centre approved by REN and REE, in Portugal and Spain, respectively. The centre centralises real-time management of photovoltaic parks, energy storage units and industrial consumption, maximising the value of the energy produced, Galp said.

The BESS technology is being provided by China-based firm Sungrow, specifically its PowerTitan 2.0 solution. The projects will include grid-forming inverters. Galp said this means the projects will be able to participate in various energy markets and system services, including fast frequency reserve, voltage regulation and provide synthetic inertia services. Galp is already providing mFRR and aFRR ancillary services and voltage regulation, presumably with its 5MW/20MWh BESS.

The Spanish and Portuguese energy storage markets are set to grow as more renewables come online, in initially supported by the countries’ respective capex schemes. Spain has a €700 million programme for energy storage grants, officially launched earlier this year.

But the blackout which affected virtually the whole Iberian region earlier this year has also put the spotlight on the potential of BESS, particularly grid-forming BESS, to support the grid. For its part, Portugal this past week announced plans to invest €400 million to improve its grid management capabilities and up its BESS capacity, in addition to the €100 million scheme. Similar moves have been discussed, but not finalised, in Spain.

A substantial part of the business case for BESS in the region will be hybridisation with solar PV. To that end, the region’s first hybrid solar-and-storage power purchase agreement (PPA), announced by Zelestra and EDP this past week, is a positive development and possibly a sign of things to come.

24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!
9 June 2026
Stuttgart, Germany
Held alongside The Battery Show Europe, Energy Storage Summit provides a focused platform to understand the policies, revenue models and deployment conditions shaping Germany’s utility-scale storage boom. With contributions from TSOs, banks, developers and optimisers, the Summit explores regulation, merchant strategies, financing, grid tariffs and project delivery in a market forecast to integrate 24GW of storage by 2037.
2 December 2026
Italy
Battery Asset Management Summit Europe is the annual meeting for owners, operators, investors, and optimisation specialists working with operational BESS assets across the continent. The Summit focuses on how to maximise performance and revenue, manage degradation, integrate advanced optimisation software, navigate evolving market and regulatory frameworks, and plan for repowering or end-of-life strategies. With insights from Europe’s most active storage markets, it equips attendees with practical guidance to run resilient, profitable battery portfolios as the sector scales.

Read Next

February 16, 2026
Developer-operator Plus Power is now operating its 175MW/350MWh Cross Town Energy Storage facility in Gorham, Maine, US.
February 16, 2026
The UK just saw its biggest year of grid-scale battery storage deployments, but planning barriers “threaten to stall momentum,” according to one expert.
February 12, 2026
A 582MWh battery storage project and a gigawatt-hour-scale thermal energy storage system are the latest big developments in the emerging Baltic region, north-eastern Europe.
February 11, 2026
Germany’s BESS market is booming but is still far behind what it is needed for its energy transition. 2026 will be a key year in this regard with several key regulatory questions potentially clarified, writes energy transition comms executive Frederik König.
February 11, 2026
Netherlands-based iron-air long-duration energy storage (LDES) startup Ore Energy has completed a grid-connected pilot of its 100-hour iron-air LDES system at EDF Lab les Renardières in France.