EDF signs 20-year PPA for New Mexico solar-plus-storage project

By Jonathan Touriño Jacobo
LinkedIn
Twitter
Reddit
Facebook
Email

EDF Renewables in North America has signed a 150MW solar-plus-storage 20-year power purchase agreement (PPA) with utility El Paso Electric in New Mexico, US.

The Milagro solar-plus-storage project will be located on undeveloped private land in the Santa Teresa area of Doña Ana County and is expected to reach commercial operation in 2025.

This marks the first solar-plus-storage project in New Mexico for EDF Renewables, a subsidiary of French multinational power company EDF, with the battery storage side sized at 75MW output and 300MWh capacity (4-hour duration).

Matthew Beltz, director of origination & power marketing at EDF Renewables, said: “We are excited to build our first solar-plus-storage project in New Mexico and to support EPE as the project delivers long-term price stability, stimulates economic growth, and reduces emissions.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

In the neighbouring state of Texas, EDF Renewables sold a 200MW solar PV plant to energy company Southern Power – a subsidiary of utility the Southern Company – last week. The project has the potential to increase its power capacity to 500MW and is expected to be operational in the fourth quarter of 2025.

Earlier this month the French utility inked a similar PPA in South Africa for a 115MW solar PV plant and 30MW battery energy storage system (BESS) output.

This story first appeared on PV Tech.

Read Next

May 20, 2026
Independent power producer (IPP) Sunraycer Renewables has closed a US$901 million project financing facility, supporting three solar-plus-storage projects in Texas, US.
May 19, 2026
Ford Energy, the wholly owned subsidiary of Ford Motor Company and developer EDF power solutions North America have announced a five-year battery energy storage system (BESS) supply agreement.
May 19, 2026
Swedish independent power producer (IPP) OX2 has confirmed it has started construction activities at the 100MW/300MWh Muswellbrook solar-plus-storage site in New South Wales (NSW), Australia.
May 15, 2026
Spanish developer and independent power producer (IPP) Zelestra has energised its 1GWh battery energy storage system (BESS) in the Atacama Desert in Chile.
Premium
May 13, 2026
We catch up with Ingmar Wilhelm, co-founder and CEO of developer and IPP Galileo, after the firm commissioned its first own-operate renewable energy project.