EDF signs 20-year PPA for New Mexico solar-plus-storage project

By Jonathan Touriño Jacobo
LinkedIn
Twitter
Reddit
Facebook
Email

EDF Renewables in North America has signed a 150MW solar-plus-storage 20-year power purchase agreement (PPA) with utility El Paso Electric in New Mexico, US.

The Milagro solar-plus-storage project will be located on undeveloped private land in the Santa Teresa area of Doña Ana County and is expected to reach commercial operation in 2025.

This marks the first solar-plus-storage project in New Mexico for EDF Renewables, a subsidiary of French multinational power company EDF, with the battery storage side sized at 75MW output and 300MWh capacity (4-hour duration).

Matthew Beltz, director of origination & power marketing at EDF Renewables, said: “We are excited to build our first solar-plus-storage project in New Mexico and to support EPE as the project delivers long-term price stability, stimulates economic growth, and reduces emissions.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

In the neighbouring state of Texas, EDF Renewables sold a 200MW solar PV plant to energy company Southern Power – a subsidiary of utility the Southern Company – last week. The project has the potential to increase its power capacity to 500MW and is expected to be operational in the fourth quarter of 2025.

Earlier this month the French utility inked a similar PPA in South Africa for a 115MW solar PV plant and 30MW battery energy storage system (BESS) output.

This story first appeared on PV Tech.

Read Next

August 17, 2026
Independent power producer (IPP) Econergy has signed financing agreements for its Părău 2 solar and energy storage project in Brașov County, Romania.
August 14, 2026
Australian developer Edify Energy has reached financial close on the Ganymirra and Majors Creek solar-plus-storage projects near Townsville in North Queensland, featuring 360MWp of solar generation and 300MW/1,200MWh of battery storage.
August 13, 2026
Scatec has started full commercial operations at its gigawatt-scale Obelisk solar-plus-storage project in Egypt.
August 12, 2026
Independent power producer (IPP) Verano Energy has awarded the battery energy storage system (BESS) supply for its 152MW/606MWh Observatorio project to Sungrow.
August 12, 2026
EPEC Group has been awarded a contract to cover the high-voltage connection works for the Lower Wonga Solar Farm in Queensland, Australia, by the EPC contractor INTEC Energy Solutions.