EDF signs 20-year PPA for New Mexico solar-plus-storage project

By Jonathan Touriño Jacobo
LinkedIn
Twitter
Reddit
Facebook
Email

EDF Renewables in North America has signed a 150MW solar-plus-storage 20-year power purchase agreement (PPA) with utility El Paso Electric in New Mexico, US.

The Milagro solar-plus-storage project will be located on undeveloped private land in the Santa Teresa area of Doña Ana County and is expected to reach commercial operation in 2025.

This marks the first solar-plus-storage project in New Mexico for EDF Renewables, a subsidiary of French multinational power company EDF, with the battery storage side sized at 75MW output and 300MWh capacity (4-hour duration).

Matthew Beltz, director of origination & power marketing at EDF Renewables, said: “We are excited to build our first solar-plus-storage project in New Mexico and to support EPE as the project delivers long-term price stability, stimulates economic growth, and reduces emissions.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

In the neighbouring state of Texas, EDF Renewables sold a 200MW solar PV plant to energy company Southern Power – a subsidiary of utility the Southern Company – last week. The project has the potential to increase its power capacity to 500MW and is expected to be operational in the fourth quarter of 2025.

Earlier this month the French utility inked a similar PPA in South Africa for a 115MW solar PV plant and 30MW battery energy storage system (BESS) output.

This story first appeared on PV Tech.

Read Next

August 22, 2025
Spanish utility Iberdrola and power conversion specialist firm Ingeteam have partnered to hybridise Spanish operational PV plants with battery energy storage systems (BESS).
August 20, 2025
US-based renewable energy developer National Renewable Solutions (NRS) announced its 140MWac solar energy and 50MW battery storage Shallow Basket Energy project is now operational.
August 18, 2025
Copenhagen Infrastructure Partners (CIP) has acquired full ownership of the 1GWh Beehive battery energy storage system (BESS) in Arizona, US, from EDF Renewables North America.
August 14, 2025
The government of Indonesia has launched a programme that aims to build 100GW of solar PV and 320GWh of BESS in the coming years, mostly distributed across smaller projects in rural areas.
August 13, 2025
Independent power producer (IPP) Africa REN has commissioned a solar and storage project in Senegal, which it claimed as the first of its kind in West Africa.

Most Popular

Email Newsletter