EDF signs 20-year PPA for New Mexico solar-plus-storage project

By Jonathan Touriño Jacobo
September 27, 2023
LinkedIn
Twitter
Reddit
Facebook
Email

EDF Renewables in North America has signed a 150MW solar-plus-storage 20-year power purchase agreement (PPA) with utility El Paso Electric in New Mexico, US.

The Milagro solar-plus-storage project will be located on undeveloped private land in the Santa Teresa area of Doña Ana County and is expected to reach commercial operation in 2025.

This marks the first solar-plus-storage project in New Mexico for EDF Renewables, a subsidiary of French multinational power company EDF, with the battery storage side sized at 75MW output and 300MWh capacity (4-hour duration).

Matthew Beltz, director of origination & power marketing at EDF Renewables, said: “We are excited to build our first solar-plus-storage project in New Mexico and to support EPE as the project delivers long-term price stability, stimulates economic growth, and reduces emissions.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

In the neighbouring state of Texas, EDF Renewables sold a 200MW solar PV plant to energy company Southern Power – a subsidiary of utility the Southern Company – last week. The project has the potential to increase its power capacity to 500MW and is expected to be operational in the fourth quarter of 2025.

Earlier this month the French utility inked a similar PPA in South Africa for a 115MW solar PV plant and 30MW battery energy storage system (BESS) output.

This story first appeared on PV Tech.

Read Next

April 8, 2026
IPPs Zelestra, BNZ and ALFI have secured offtake and financing to hybridise solar projects with BESS across Spain, Italy, Portugal and Romania. 
April 7, 2026
FlexGen has acquired CES, which has to date commissioned more than 15GWh of battery energy storage system (BESS) projects.  
March 30, 2026
Chile continues to be Latin America’s hotspot for energy storage deployments, with a major new deal for Grenergy and Engie bringing a project online in the past week.
March 27, 2026
IPP Akuo will soon start building a 2.75-hour BESS project in Borba, Portugal, integrated into its 181MW Santas solar PV plant.
March 27, 2026
Iberdrola has added its 360MWh Broadsound battery energy storage system (BESS) to AEMO’s Market Management System (MMS).