Canadian Solar to provide 315MWh BESS, 2GWp solar for Sunraycer projects in Texas

LinkedIn
Twitter
Reddit
Facebook
Email

Solar PV and battery energy storage system (BESS) firm Canadian Solar will deliver 315MWh of BESS and up to 2GWp of solar modules to Sunraycer Renewables for projects in Texas, US.

Canadian Solar has executed three agreements with Sunraycer for two BESS projects in Texas and the purchase of up to 2GWp of solar modules for various Sunraycer projects.

E-Storage, Canadian Solar’s energy storage subsidiary, will provide 188MWh DC to the Gaia project in Navarro County, Texas and 127MWh DC to the Midpoint project in Hill County, Texas. The projects are scheduled for commissioning in Q3 of 2025.

The projects will both use over 60 SolBank 3.0 battery containers. The containerised energy storage system features lithium-iron-phosphate (LFP) cells, e-Storage’s battery management system software, and a modular design.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Sunraycer will also deploy up to 2GWp of Canadian Solar’s solar modules across various projects. Canadian Solar says the modules offer up to 85% bifaciality and 23.3% module efficiency, with low power degradation and high energy yield. The company claims these features will reduce the levelised cost of energy (LCOE) and system cost.

Colin Parkin, president of e-Storage said of the recent agreements: “We are excited to strengthen our presence in Texas with the Gaia and Midpoint projects. These two battery energy storage installations represent a significant contribution to Texas’s growing renewable energy infrastructure, enhancing grid stability and supporting the state’s clean energy transition.”

Texas, where the grid is managed by ERCOT, is the second most active BESS market in the US after California, though developing there is not without its challenges.

In Van Zandt County, 20 residents have filed a lawsuit seeking damages and an injunction (Premium access article) against the renewable energy investment arm of Finland’s Taaleri Group and the US arm of UK-based RES Group over the construction of a lithium-ion BESS.

This followed the October news that council members at Katy, Texas voted to deny a Special Use Permit for a 500MW standalone BESS proposed by IPP Vesper Energy (Premium access article).

On the upstream side, Texas is also where Freyr acquired Chinese firm Trina Solar’s manufacturing facility, in Wilmer. Freyr claims creating US solar production facilities will solve a bottleneck for developers.

Canadian Solar meanwhile was also involved in taking over a BESS and cell manufacturing facility in Kentucky, in a factory vacated by metal-hydrogen battery company EnerVenue. Canadian Solar is set to invest an initial US$384 million into the facility through e-Storage.

The deployment of solar and energy storage projects in the US should be boosted by upstream projects like these. However, time will tell how newer US facilities compare to established facilities elsewhere, notably in China which dominates the solar and BESS markets.

26 November 2026
9am GMT / 1pm GST
In this webinar, Florian Didier and Salomé Perperot from Clean Horizon share the approach they use when supporting IPPs through optimiser selection and contract negotiation across Europe. The presentation will be followed by a live Q&A session in which attendees can put their own questions to the speakers. Who should attend: IPPs and developers, asset owners and investors, lenders and financial advisors, and anyone involved in the commercial structuring of battery storage projects.
22 February 2027
InterContinental London - The O2, London, UK
The Future of Energy Storage Starts Here Three days in London where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into European storage, this is that room.

Read Next

November 9, 2026
A new report prepared by The Brattle Group for The Pew Charitable Trusts finds that removing barriers to distributed energy resources (DERs) could avoid an estimated US$614 billion in US power system costs through 2050.
November 9, 2026
Derrick Flakoll, senior policy associate for North America at BloombergNEF, has offered a more measured take on how the Democrats’ midterm victories could affect the battery energy storage system (BESS) sector.
November 9, 2026
Australian renewable energy generator and retailer Pacific Blue has referred an 855MWh BESS in Victoria to Australia’s EPBC Act.
November 9, 2026
Energy held in battery energy storage systems (BESS) across Australia’s NEM reached a record 20.17GWh on 6 November.
November 6, 2026
Renewables developer D. E. Shaw Renewable Investments (DESRI) and Ford Motor Company’s energy storage subsidiary, Ford Energy, will partner to deploy energy storage in the US.