Construction is underway on a 100MWh thermal energy storage project in Finland, using the same ‘Sand Battery’ technology as a 8MWh system which came online in 2022.
System integrator NHOA Energy will provide Spanish transmission system operator (TSO) Red Eléctrica with 140MW/105MWh of BESS for two separate storage-as-transmission projects on the Balaeric Islands.
Steag subsidiary Iqony and Fluence will deploy a 50MW/200MWh BESS project in Germany, part of which will be contracted under a PPA with train network operator Deutsche Bahn.
Progress on another US Department of Energy (DOE) loan for the battery sector has been announced, this time by NeoVolta, the third in the space of a week since the US election.
A double-header of tax equity news from the California BESS market, with IPPs Ormat Technologies and esVolta both completing deals for grid-scale projects in the state.
IPP Innergex and system integrator Prevalon Energy have agreed to nearly double the capacity of BESS capacity at two sites in Chile with existing operational facilities.