Younicos, Panasonic and utility Xcel Energy partner on solar storage system in Denver

LinkedIn
Twitter
Reddit
Facebook
Email

The system will be developed at the operations hub for Panasonic Enterprise Solutions Company and Panasonic CityNOW in Denver. Image: Panasonic
Energy storage system integrator Younicos has signed off on a deal with Panasonic to design and develop a solar-plus-storage system at Peña Station NEXT in Denver, Colorado, which includes the operations hub for Panasonic Enterprise Solutions Company and Panasonic CityNOW.

The installation will utilise multiple Younicos Y.Cubes, a “storage-in-a-box” solution for C&I applications from the German-American industry company. Y.Cube includes power conversion system and DC battery block, with controls embedded in the power conversion system. The systems are available in 250kVA to 500kVA configurations.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The project will see four Y.Cubes installed at the Panasonic facility in Denver, Colorado. The 1MW storage system, which will be connected to Xcel Energy’s power grid, will offer frequency regulation, solar grid integration through ramp control, grid peak shaving, passive energy arbitrage, and backup power. This system will allow Panasonic and other microgrid stakeholders to gain maximum energy yield from Xcel Energy’s 1.6 MW solar PV system located on a nearby parking structure, along with 259 kW of PV on the building’s rooftop.

Jamie Evans, managing director of the energy solutions group at Panasonic Enterprise Solutions Company, said: “The solar-plus-storage microgrid is an anchor, not just of Panasonic’s new Denver operations hub, but also for the broader Peña Station NEXT development, which is a 400-acre, smart and sustainable transit-oriented development in Denver. We are excited to partner with Younicos and Xcel Energy to bring this innovative project to life.”

Younicos Y.Cube storage system. Image: Younicos.

Read Next

Premium
May 8, 2025
Swift Current Energy has encountered a major stumbling block in developing a standalone BESS in Virginia.
May 8, 2025
Developer and IPP Leeward Renewable Energy’s (LRE) 88MW/352MWh Chaparral Springs battery energy storage system (BESS) in Kern County, California is now fully operational.
May 8, 2025
7.15GW of renewables and energy storage projects have been granted access rights to connect to Australia’s first REZ in Central-West Orana.
May 7, 2025
Europe breaking battery storage deployment records, but more still needs to be done to accelerate uptake, according to SolarPower Europe.
May 7, 2025
AEMO has revealed a big increase in battery energy storage system (BESS) output in Australia’s National Electricity Market (NEM).

Most Popular

Email Newsletter