Wirsol and Edify build Tesla battery retrofit at 60MW solar farm in Victoria

LinkedIn
Twitter
Reddit
Facebook
Email
The project had to overcome unique regulatory and technical challenges. Credit: Wirsol

Contruction of a Tesla powerpack battery at the 60MW Gannawarra solar farm in Victoria, Australia – said the be the first battery storage system that has been retrofitted to an existing solar farm in the country – has been completed ahead of schedule.

Wirsol Energy, the Australian arm of the Wircon Group, and Edify Energy both own the 25MW/50MWh retrofit Gannnawarra Energy Storage System (GESS), which was developed by Edify.

According to a Wirsol release, the project had to overcome unique regulatory and technical challenges, but it now demonstrates the huge opportunity for integrating large-scale battery storage with solar projects.

Wirsol has now commissioned the 60MW Gannawarra Solar Farm and also connected the 110MW Wemen Solar Farm to the grid, again in Victoria. The two PV projects will power the equivalent of approximately 52,100 Victorian homes over the course of the year.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

RCR Tomlinson, the EPC Contractor responsible for constructing Wemen Solar Farm, will continue commissioning with the goal of achieving completion by year end. The Wemen proejct has roughly 319,000 modules installed, making it one of the largest PV projects in Victoria.

Mark Hogan, MD of Wirsol, said: “We are delighted to reach two crucial milestones at Gannawarra Solar Farm. The overall project and how it has evolved is unique to the industry which in turn sets a benchmark for future projects, which enables the ability to optimise the delivery of energy at peak times supporting demand throughout the daily cycle. We are proud to be a major contributor towards Victoria’s renewable energy target, with two of the state’s largest projects now operating. This also underwrites our own personal mission of deploying greater than one gigawatt of solar energy by the year ending 2020 in Australia. Maintaining the deployment of solar, coupled with storage where appropriate, is a cornerstone in attaining sustainable and affordable clean energy, which is evidently now within reach on a global scale, specifically within Australia.”

The Victorian government targets 25% renewables by 2020, 40% by 2025 and 50% by 2030 if re-elected.

A consortia led by Spotless Sustainability Services has also been delivering a 30MW/30MWh grid-connected battery at a terminal station in Warrenheip, Ballarat. Fluence, which was launched jointly by global engineering giant Siemens and energy storage system integrator and developer AES last year, will supply the battery, which will then be owned by AusNet. The Ballarat transmission terminal is heavily congested so the battery will be able to offer grid stability and reduce the need for expanding the substation. Moreover, the battery will help to increase the amount of energy supplied by surrounding wind and solar generation, at reduced cost.

Both batteries will be operated by utility EnergyAustralia under long-term power purchase agreements (PPAs).

Read Next

July 30, 2025
Australia’s minister for climate change and energy, Chris Bowen, has confirmed that the Capacity Investment Scheme (CIS) will be upsized from 32GW to 40GW.
July 29, 2025
The New South Wales government has announced plans to launch a new tender seeking 500MW of firming capacity, seeking bids from battery energy storage, gas and virtual power plants (VPP).
July 29, 2025
Australia’s Clean Energy Finance Corporation (CEFC) has announced it has invested a record AU$4.7 billion (US$3.09 billion) in large-scale renewables, energy storage, and transmission projects during the 12-month period ending 30 June 2025.
July 28, 2025
Lithium-ion battery storage system integrator Fluence and independent power producer (IPP) Invenergy will be partnering on the 475MW solar and 1,900MWh energy storage Hashknife Solar Energy Centre in Navajo County, Arizona, US.
July 28, 2025
DP Energy has announced plans to build a wind-plus-storage project in Queensland, Australia, featuring up to 2,000MWh of BESS.

Most Popular

Email Newsletter