UK’s Ofgem and BEIS aiming for ‘late May, early June’ release for smart power CFE response

February 28, 2017
LinkedIn
Twitter
Reddit
Facebook
Email
The response will set out the direction of travel and expectations for the UK’s energy storage market. Credit: Ofgem

UK regulator Ofgem and the Department for Business, Energy and Industrial Strategy (BEIS) are planning to publish their response to the smart power call for evidence (CFE) in late May or early June, according to the regulator’s Andrew Burgess.

Burgess, associate partner for energy systems at Ofgem, confirmed the timeline this morning whilst speaking at Solar Media’s Energy Storage Summit, adding that the response would set out the “direction of travel and expectations” for the UK’s energy storage market.

Delayed in its publication as a result of last year’s Brexit referendum, BEIS and Ofgem finally published the CFE last November.

The document sought the energy market’s views on how the UK should transition towards a smarter, more flexible network capable of incorporating greater quantities of variable generation, while also considering both the definition of storage and its place in the grid.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Responses were welcomed until 12 January 2017 and Burgess revealed this morning that more than 240 individual responses were received and are now being reviewed.

Of these 240+ responses around 150 discussed energy storage applications, a fact which Burgess said suggested just how integral the industry views this technology is for future infrastructure.

Burgess said that the CFE had provided useful contributions towards an overarching definition for energy storage and the barriers the industry is currently facing, and that Ofgem’s response will outline a series of working packages that will help to remove those barriers.

A late May/early June publication would tie in with another, altogether separate crucial piece of policy work BEIS is currently working on in the emissions reduction plan.

That piece of work, much like the CFE, has been repeatedly delayed and last month the department refused to commit to a timeframe for its release.

However last week the Conservative MP and former member of the energy and climate change select committee James Heappey said at a RenewablesUK event that the plan could be expected as late as June, potentially coinciding with the CFE.

15 April 2026
Milan Marriott Hotel, Italy
Solarplus Europe 2026 marks the evolution of Europe’s longest-running solar conference, reflecting the industry’s transition from standalone PV to fully integrated solar-plus-storage and hybrid energy systems. Taking place in Milan, the Summit will unite developers, investors, policymakers, and technology leaders to explore how Europe can deliver firm, flexible, and bankable renewable power at scale. With a sharp focus on system integration, storage deployment, hybrid project design, and market-ready business models, Solarplus Europe provides the platform for shaping the next phase of the continent’s solar and clean power build-out.
22 April 2026
Texas USA
To bring buyers and sellers of power together, the Renewable Energy Revenues Summit USA will cover strategies to optimize renewable energy trading, procurement, and offtake structures across U.S. markets.
20 May 2026
London, UK
The Renewables Procurement & Revenues Summit serves as the UK and Irish platform for connecting renewable energy suppliers to the future of energy demand. This includes bringing together a community of European off-takers, renewable generators, utilities, asset owners, and financiers. The challenges ahead are complex, but through collaboration, innovation, and a shared vision, we can navigate uncertainties and forge a sustainable energy future. Let us harness our collective knowledge to advance the renewable energy agenda.
9 June 2026
Stuttgart, Germany
Held alongside The Battery Show Europe, Energy Storage Summit provides a focused platform to understand the policies, revenue models and deployment conditions shaping Germany’s utility-scale storage boom. With contributions from TSOs, banks, developers and optimisers, the Summit explores regulation, merchant strategies, financing, grid tariffs and project delivery in a market forecast to integrate 24GW of storage by 2037.
23 June 2026
Munich, Germany
Every year, ees Europe, Europe’s largest and most international exhibition for batteries and energy storage systems, provides a networking opportunity for the industry’s key players – all under the motto “Innovating Energy Storage”. It focuses on the latest technologies, trends and market developments. ees Europe will take place from June 23–25, 2026 – for the first time running from Tuesday to Thursday – as part of The smarter E Europe at Messe München.
23 June 2026
Toronto Congress Centre, Canada
Battery Asset Management Summit is a globally recognized Summit series focused exclusively on the operational, commercial, and technical performance of utility-scale battery assets. In 2026, the Summit arrives in Canada for the first time, at a pivotal moment for the country’s energy storage market and wider energy transition.

Read Next

Premium
April 9, 2026
What does the combination of regulatory, supply chain and market pressures mean for the cost of building large-scale BESS this year?
April 9, 2026
Gridstor and Axpo have executed an energy storage revenue swap agreement for a 220MW/440MWh BESS in Galveston County, Texas.
April 9, 2026
Maxxen managing director Ruben Valiente speaks with Energy-Storage.news editor Andy Colthorpe at Energy Storage Summit 2026 in London.
Premium
April 9, 2026
We analyse and compare the metrics of the various LFP battery cells of 587Ah and above, from leading providers CATL, Eve Energy, Hithium, Rept Battero, CALB and BYD.
April 9, 2026
Multinational power firm Engie has acquired two large-scale BESS projects in Spain, paired with synchronous condensers and has launched construction on a BESS in France.