UK’s Ofgem and BEIS aiming for ‘late May, early June’ release for smart power CFE response

LinkedIn
Twitter
Reddit
Facebook
Email
The response will set out the direction of travel and expectations for the UK’s energy storage market. Credit: Ofgem

UK regulator Ofgem and the Department for Business, Energy and Industrial Strategy (BEIS) are planning to publish their response to the smart power call for evidence (CFE) in late May or early June, according to the regulator’s Andrew Burgess.

Burgess, associate partner for energy systems at Ofgem, confirmed the timeline this morning whilst speaking at Solar Media’s Energy Storage Summit, adding that the response would set out the “direction of travel and expectations” for the UK’s energy storage market.

Delayed in its publication as a result of last year’s Brexit referendum, BEIS and Ofgem finally published the CFE last November.

The document sought the energy market’s views on how the UK should transition towards a smarter, more flexible network capable of incorporating greater quantities of variable generation, while also considering both the definition of storage and its place in the grid.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Responses were welcomed until 12 January 2017 and Burgess revealed this morning that more than 240 individual responses were received and are now being reviewed.

Of these 240+ responses around 150 discussed energy storage applications, a fact which Burgess said suggested just how integral the industry views this technology is for future infrastructure.

Burgess said that the CFE had provided useful contributions towards an overarching definition for energy storage and the barriers the industry is currently facing, and that Ofgem’s response will outline a series of working packages that will help to remove those barriers.

A late May/early June publication would tie in with another, altogether separate crucial piece of policy work BEIS is currently working on in the emissions reduction plan.

That piece of work, much like the CFE, has been repeatedly delayed and last month the department refused to commit to a timeframe for its release.

However last week the Conservative MP and former member of the energy and climate change select committee James Heappey said at a RenewablesUK event that the plan could be expected as late as June, potentially coinciding with the CFE.

10 September 2026
This session is a practical, operator-led conversation about the battery anomalies that erode utility-scale battery energy storage systems’ (BESS) capacity and availability, and what it takes to catch them before they materially impact the P&L. Neoen, one of the world’s leading independent power producers, brings the operator’s perspective from a growing storage fleet, and PowerUp provides the analytics that make these patterns visible earlier. You leave with a clearer sense of where these losses hide and what it takes to act on them across your own portfolio. Who’s it for: owners, operators, asset managers, and integrators of grid-scale BESS assets.
14 September 2026
Rotterdam, Netherlands
The EU PVSEC is the world’s leading forum for photovoltaic research and the largest PV-dedicated scientific conference. It covers the full PV value chain, from materials and devices to systems, BIPV, agrivoltaics and floating PV, with an accompanying exhibition showcasing innovations. The EU PVSEC 2026 takes place 14–18 September at the WTC Rotterdam, the Netherlands.
15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.
15 September 2026
Berlin, Germany
Launching September 2026 in Berlin, Energy Storage Summit Germany is a new standalone event dedicated to Germany’s energy storage market. Bringing together investors, developers, policymakers, TSOs, manufacturers and optimisation specialists, the Summit explores the regulatory shifts, revenue models, financing strategies and technology innovations shaping large-scale deployment. With Germany targeting 80% renewables by 2030, it offers a focused platform to connect with the decision-makers driving the Energiewende and the future of utility-scale storage.
6 October 2026
Warsaw, Poland
The Energy Storage Summit Central Eastern Europe is set to return in September 2025 for its third edition, focusing on regional markets and the unique opportunities they present. This event will bring together key stakeholders from across the region to explore the latest trends in energy storage, with a focus on the increasing integration of energy storage into regional grids, evolving government policies, and the growing need for energy security.
13 October 2026
London, UK
Now in its second edition, the Summit provides a dedicated platform for UK & Ireland’s BESS community to share practical insights on performance, degradation, safety, market design and optimisation strategies. As storage deployment accelerates towards 2030 targets, attendees gain the tools needed to enhance returns and operate resilient, efficient assets.

Read Next

September 10, 2026
Akaysha Energy’s Waratah Super Battery in Australia briefly reached its full rated output of 850MW on 7 September.
September 10, 2026
The venture-capital-style returns once available in Australia have disappeared, according to panellists at the Battery Asset Management Summit Australia 2026.
September 9, 2026
The global battery energy storage market is entering a new phase, with shifting cell prices, intensifying competition and rapid international expansion reshaping the supplier landscape.
September 9, 2026
Utility Black Hills Energy has announced it will move forward with the construction of a 50MW/200MWh energy storage facility at its Pueblo Airport Generating Station (PAGS) in Colorado, US.
September 9, 2026
Trade association Energy Storage Canada (ESC) has recommended establishing a Distributed Reliability Track for behind-the-meter (BTM) and distribution-connected energy storage in Ontario.