Vanadium redox flow technology provider redT energy has passed its G59 pre-testing for its 15kW / 240kWh vanadium flow energy storage systems, which are located at the Power Networks Demonstration Centre (PNDC) in Cumbernauld, Scotland.
While the effectiveness of flow batteries in islanded situations is quickly being recognised, on the grid, the cost of providing that storage is still seen as something of an inhibitor to uptake. Andy Colthorpe spoke with the RedT CEO, Scott McGregor, to get his views on how flow batteries can thrive – and why lithium-ion is not the enemy.