Western Australia’s Premier Roger Cook of the Labor Party has pledged to invest AU$150 million (US$92.4 million) into a 500MWh 10-hour duration vanadium battery energy storage system (BESS) should it be re-elected in the upcoming state election.
Energy Storage Award 2024 winner, Semih Oztreves, head of network infrastructure at BESS developer-investor Zenobē Energy, takes part in our annual Q&A series.
The US Department of Energy’s (DOE) Loan Programs Office (LPO) has made a conditional commitment for a loan to long-duration energy storage (LDES) developer and operator Hydrostor of up to US$1.76 billion.
Ofgem, the UK’s energy market regulator, is considering raising the minimum duration of technologies eligible for a long-duration energy storage (LDES) support scheme.
Researchers at the US Department of Energy’s (DOE) Pacific Northwest National Laboratory (PNNL) have developed the EZBattery Model, a simulation tool for predicting the performance of redox flow batteries.
Eos Energy Enterprises has signed a joint development agreement (JDA) with FlexGen Power Systems to develop a fully integrated battery energy storage system (BESS) solution using Eos’ zinc batteries and Flexgen’s Energy Management System (EMS).