Battery energy storage system (BESS) integrator Fluence will provide 35MW/100MWh of its technology to utility and IPP Engie for a project in the Netherlands.
ENGIE Storage will provide a 4MWh energy storage system paired with a solar PV install as part of San Diego International Airport’s wider energy transformation plan.
California’s recent droughts and ongoing need to economise water use have inspired more commercial energy storage at a local water board, with ENGIE Storage delivering a project for the San Diego Water Authority.