Samsung SDI signs 1GWh US BESS supply agreement with Alpha Omega Power

LinkedIn
Twitter
Reddit
Facebook
Email

South Korean battery and electronics materials manufacturer Samsung SDI has signed a 1GWh supply agreement with US IPP Alpha Omega Power (AOP).

Announced 26 October, Samsung SDI signed the supply agreement through its Michigan, US-based subsidiary Samsung SDI America (SDIA). Including an initial contract signed late last year, the two agreements total 1.5GWh.

AOP plans to deploy the battery energy storage system (BESS) solutions supplied by Samsung SDI designed for large-scale power projects and power demand growth, scheduled to begin construction in the Western Energy Coordinating Council (WECC) and Electric Reliability of Council of Texas (ERCOT) power markets next year.

Under the latest agreement, SDIA will supply its Samsung Battery Box (SBB) 1.7, a BESS solution featuring nickel cobalt aluminum (NCA) batteries. All cells and modules will be manufactured at the StarPlus Energy (SPE) plant in Kokomo, Indiana, and delivered by the end of this year.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Earlier this year, Samsung SDI announced that it had secured a KRW1.5 trillion (US$1 billion) deal to supply its BESS solution to an undisclosed company over a four-year period at its StarPlus Energy plant, a joint venture (JV) between Samsung SDI and automaker Stellantis.

According to SDIA, SBB 1.7 delivers 17% higher energy density than its predecessor, SBB 1.5, while maintaining the same 20-foot footprint. The BESS also incorporates AI-powered algorithms for early anomaly detection and battery life prediction and is designed for 25 years of continuous use.

Further, SBB 1.7 has obtained NFPA 855 certification for the installation of stationary energy storage systems, and UL 9540, a safety standard for ESS. The BESS also incorporates Samsung SDI’s proprietary Enhanced Direct Injection (EDI) technology, which directly injects fire-extinguishing agents into individual battery modules.

In March, Hanjung America, a subsidiary of South Korea-based battery manufacturer Hanjung NCS announced it would build its first US ESS manufacturing facility in the US, supplying cooling systems and advanced direct injection fire extinguishers for BESS, supporting the supply chain for the StarPlus Energy manufacturing plant.

Energy-Storage.news reported in August that Samsung SDI returned to operating profit in Q2 after a strong battery sales rebound and remains on track to begin US LFP cell production for BESS, with demand for its ESS business expected to stay robust even if AI data centre growth slows.

26 November 2026
9am GMT / 1pm GST
In this webinar, Florian Didier and Salomé Perperot from Clean Horizon share the approach they use when supporting IPPs through optimiser selection and contract negotiation across Europe. The presentation will be followed by a live Q&A session in which attendees can put their own questions to the speakers. Who should attend: IPPs and developers, asset owners and investors, lenders and financial advisors, and anyone involved in the commercial structuring of battery storage projects.
22 February 2027
InterContinental London - The O2, London, UK
The Future of Energy Storage Starts Here Three days in London where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into European storage, this is that room.
20 April 2027
Renaissance Dallas at Plano Legacy West Hotel, Dallas, Texas, Dallas
Policy, Procurement and Power Demand: Defining the Next Chapter for Energy Storage. Two days in Dallas where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into US storage, this is that room.

Read Next

November 16, 2026
US energy storage developer Flatiron Energy has broken ground on its 250MW/1,200MWh Energizar Energy Storage Project in Chelsea, Massachusetts, US.
November 16, 2026
US-based BESS manufacturer NeoVolta has signed a US$116 million master purchase agreement with an unnamed “leading energy solutions provider.”
Premium
November 16, 2026
ESN Premium speaks with to Suraj Narayan, managing director, Australia, at Valo, about the company’s new ownership.
November 13, 2026
US distributed energy resource (DER) installer Sunrun has announced a preferred equity investment with energy investment firm Captona.
November 13, 2026
West Arthur Energy, a project company owned by Western Australian developer Lacour Energy, has referred a wind generation site with a 4,000MWh battery energy storage system (BESS) to Australia’s EPBC Act.