PODCAST: The energy transition in the Middle East, VPPs in Italy and coal’s diminishing status

LinkedIn
Twitter
Reddit
Facebook
Email
Image: Scatec Solar.

In today’s episode, ESN’s Andy Colthorpe and Liam Stoker explore the way grids are changing in the Middle East to accommodate clean energy, the role virtual power plants are playing in Italy, and the contrasting role coal is playing in Germany and bush fire-stricken Australia.

The podcast can be streamed below:

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Alternatively, you can subscribe and listen to the podcast on the Solar Media Editor’s Channel, which is now on all popular audio channels, including;

3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

October 2, 2026
India’s Union Cabinet has approved US$ 19.3 billion Green Energy Corridor, including US$ 5.2 billion for 50GWh BESS through FY2032-33.
October 2, 2026
Outgoing California Governor Gavin Newsom recenty addressed approximately 1,200 bills, including several energy storage and solar related bills that were either approved or vetoed.
October 2, 2026
NSW’s IPC has approved BayWa r.e.’s Bullawah Wind Farm, pairing 804MW of wind with a 718MWh battery in the South West REZ.
Premium
October 1, 2026
James Costello of EORA Energy discusses the shift from supplying battery technology to developing full energy infrastructure projects.
September 30, 2026
IPP Northland Power has announced that its 80MW/160MWh Jurassic energy storage project in Cypress County, Alberta, CA, has achieved commercial operations.