PODCAST: 2019 in review and the challenging decade ahead

By Solar Media Staff
January 2, 2020
LinkedIn
Twitter
Reddit
Facebook
Email
Analysis, backstory and context on some of last year’s biggest news stories. Image: Andy Colthorpe / Solar Media.

Liam Stoker and Andy Colthorpe reflect on the biggest news in energy storage in 2019, while also gazing into their crystal balls and predicting what the energy transition may hold in store for the year ahead.

The podcast can be streamed below:

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Alternatively, you can subscribe and listen to the podcast on the Solar Media Editor’s Channel, which is now on all popular audio channels, including;

Apple Podcasts
Spotify
Google Podcasts

Join the conversation on one of the biggest stories of the year ahead with our 2020 Social Media hashtag:

#SmartSolarStorage2020 (LINKEDIN)

#SmartSolarStorage2020 (TWITTER)

Read Next

November 28, 2025
The Australian government has officially opened CIS Tender 8, targeting 16GWh of energy storage capacity across the NEM.
November 27, 2025
A joint venture (JV) between EDF and developer AME has begun construction of large-scale battery and solar photovoltaic (PV) projects in Chile, with 2GWh storage capacity.
November 27, 2025
The Western Australian government has launched the first stage of an Expression of Interest (EOI) process for a 50MW/500MWh vanadium flow battery energy storage system (VBESS) in Kalgoorlie.
November 26, 2025
Mayor of Greater Manchester Andy Burnham marked the commencement of construction at Highview’s 300MWh liquid air energy storage facility.
November 26, 2025
Potentia Energy has received federal environmental approval for its 1,000MWh Tallawang Solar Hybrid project, and Fluence has delivered its Gridstack battery energy storage equipment to Ampyr Australia’s 600MWh Bulabul Battery installation.