Nuclear power company Westinghouse to build 2GWh pumped heat storage in Bulgaria

LinkedIn
Twitter
Reddit
Facebook
Email

Nuclear power firm Westinghouse Electric Company has signed a Memorandum of Understanding (MOU) with a state-owned energy company to build 2GWh of pumped thermal energy storage (PTES) capacity in Bulgaria.

The Pennsylvania-based firm’s MOU with Bulgarian Energy Holding (BEH), announced on 5 May, calls for the installation of two PTES units providing 2GWh of energy storage.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Westinghouse has developed its own thermal storage technology, but has also partnered with Echogen Power Systems to meet the demand for long-duration energy storage (LDES). Echogen is an Ohio-based provider of waste-heat recovery systems and electro-thermal energy storage solutions the CEO of which wrote a guest blog on Energy-storage.news last year.

The PTES technology used will enable a dispatch of 10 hours-plus, has a design life of more than 50 years and uses low-cost abundant materials when compared with more common energy storage technologies, the press release adds, not specifically naming lithium-ion.

The units will boost grid resiliency in Bulgaria and help integrate more renewables onto the national grid, the press release said.

Ivan Andreev, CEO of BEH, said: “The reliability and affordability of energy systems based on various energy sources, such as wind and solar, may depend on the ability to store large amounts of generated low-cost energy for long periods of time.”

“Large-scale deployment of LDES with the benefits this technology brings can significantly reduce the overall cost of future systems generating clean energy from renewables.”

Westinghouse has not revealed many details about its underlying PTES technology although a previous presentation from the company indicates it may involve concrete and oil.

Another PTES group, Malta Inc, converts electricity into heat and stores it in molten salt – a medium which Westinghouse says it considered – simultaneously running off cold energy which is stored in vats of a cooling liquid, then converting that heat and cool back into electrical energy using a heat engine which runs off the temperature difference.

It is the second big energy storage move made by Bulgaria in the space of a week. It has also signed an MOU with power company AES for the latter to develop a colocated 100MW solar PV with battery energy storage system and a standalone 80MWh BESS near the capital, Sofia.

Westinghouse Electric Company was spun out as a standalone nuclear power firm from Westinghouse Electric Corporation in 1997. Twenty years later, under the ownership of Toshiba, it filed for chapter 11 bankruptcy and was acquired by investment firm Brookfield Business Partners a year later. Westinghouse says its technology is the basis for half of the world’s nuclear reactors.

One of its former manufacturing facilities in Pittsburgh is now being used by Eos Energy to build its zinc battery storage manufacturing plant.

Read Next

January 6, 2025
Technology firm Hyme Energy and potential customer Arla Foods are seeking EU funding for a 200MW thermal energy storage system project, which they claim is the largest in the world.
December 12, 2024
A roundup of energy storage news from across the EU, involving Polar Night Energy’s ‘Sand Battery’ in Finland, GazelEnergie and Q Energy in France, and Spain’s MITECO awarding financial support to 45 projects.
December 11, 2024
The US Department of Energy (DOE) announced a conditional commitment to IceBrick Energy, for a loan of up to US$305.54 million to finance Project IceBrick, 9 December.
November 20, 2024
Construction is underway on a 100MWh thermal energy storage project in Finland, using the same ‘Sand Battery’ technology as a 8MWh system which came online in 2022.
November 1, 2024
A 100MW thermal solar and molten salt energy storage system in Xinjiang, China, is set to be completed and grid-connected by the end of the year, part of a project which has deployed conventional solar PV.

Most Popular

Email Newsletter