NSW launches residential solar-plus-storage guide

July 21, 2017
LinkedIn
Twitter
Reddit
Facebook
Email
NSW has 350,000 residential solar installs.

The provincial government of New South Wales has published a guide for consumers on residential solar-plus-storage.

The Australian state has a huge penetration of residential solar with energy storage now a natural next step for many households.

In order to address the comparatively more complex purchase of a battery, the NSW Home Solar Battery Guide aims to help consumers assess whether storage is a good fit and if so, to then select the correct system.

“Rooftop solar panels are more affordable than ever and the people of NSW are making the most of this clean energy opportunity,” writes Don Harwin, NSW minister for resources, energy & utilities and the arts, in the guide’s introduction. “More than 350,000 of our households are already harnessing the power of the sun.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

“Battery storage gives people the power to bank their solar supply and be able to use it any time – day or night. This means that those 350,000 households are now considering whether storage works for them.”

In acknowledgement of the fast-changing nature of the energy storage market, the report has attempted to offer general advice that won’t be easily dated.

In addition to a walkthrough of the design of a solar-plus-storage system and advice on choosing an installer, it also includes tools to assess the payback period. It puts the 2017 payback period at under 10 years for a battery in tandem with a new solar installation.

NSW’s welcome efforts to ‘empower consumers’ is in stark contrast to Queensland, which is planning to remove feed-in tariffs from solar customers who install batteries.

German storage manufacturer Sonnen is targeting 2000 installs in Australia this year for its SonnenFlat programme. SonnenFlat guarantees a fixed monthly rate for customers who add their battery to Sonnen’s connected platform.

15 April 2026
Milan Marriott Hotel, Italy
Solarplus Europe 2026 marks the evolution of Europe’s longest-running solar conference, reflecting the industry’s transition from standalone PV to fully integrated solar-plus-storage and hybrid energy systems. Taking place in Milan, the Summit will unite developers, investors, policymakers, and technology leaders to explore how Europe can deliver firm, flexible, and bankable renewable power at scale. With a sharp focus on system integration, storage deployment, hybrid project design, and market-ready business models, Solarplus Europe provides the platform for shaping the next phase of the continent’s solar and clean power build-out.
15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Read Next

April 7, 2026
Quebec-based IPP Boralex and Six Nations of the Grand River Development Corporation (SNGRDC) have announced the closing of a CA$202 million (US$145.12 million) financing for a 125MW/500MWh battery energy storage system (BESS) in Oxford County, Ontario, CA.
Premium
April 7, 2026
The project represents a US$128.6 million investment and is scheduled to begin construction this year, with commercial operations commencing in December 2026.
April 7, 2026
The NSW IPC has approved Spark Renewables’ Dinawan Solar Farm, an 800MW solar project paired with a 356MW/1,574MWh BESS.
Premium
April 2, 2026
The Reno Planning Commission, in Nevada, US, recommended approval for a conditional-use permit for the 200MW Trego Grid energy storage project on 4 March.
April 2, 2026
In this news roundup, Aypa power upsizes its credit facility, Georgia Power begins construction on a 260MW BESS, and IOWN Energy on behalf of Eolus sells a 506MWh BESS to DESRI