Germany reaches 100K home battery storage installations

LinkedIn
Twitter
Reddit
Facebook
Email
Image: BSW Solar.

A household just outside Berlin has become the recipient of the 100,000th grid-connected residential battery energy storage system in Germany.

Parliamentary State Secretary at the Federal Ministry for Economic Affairs and Energy, Thomas Bareiß attended an official event to mark the system’s commissioning in Eichwalde. Bareiß hailed the event as an “important milestone” that Germany has reached in its energy transition – referred to domestically as the Energiewende.

The politician said that since 2013 battery costs have fallen by over 50%, making the Energiewende more affordable and expanding “flexibility options” open to grid operators for intelligent load management, while bolstering energy security.

National solar trade group BSW Solar’s chief Carsten Körnig thanked the willingness of German people to invest in this technology for the future as well as the incentive programme put in place by the government five years ago, which offers rebates for equipment purchases. Körnig put forward his view that solar storage should become “the standard” if politicians are serious about the energy transition.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The next milestone to aim for, the BSW Solar managing director, is to reach 200,000 systems in the next two years. The country appears to be on a more rapid trajectory to achieving that goal than many others. By way of illustration, there were around 50,000 systems installed by mid-2017. Energy-Storage.news reported in July this year that as many as 37,000 units were sold and connected to the grid during last year, according to the European Market Monitor on Energy Storage (EMMES) from Delta-ee and trade association EASE.

This had outstripped a Delta-EE forecast of around 31,000 units for 2017. In an interview with EMMES author Valts Grintals, the Delta-EE analyst discussed some of the drivers behind this rise, including sales and marketing that is tailored to householders’ needs.

The 100,000th system, which was a Solarwatt MyReserve residential device, joins 1 million homes in Germany now with their own PV system, as announced by BSW Solar in June.

Parliamentary State Secretary at the Federal Ministry for Economic Affairs and Energy, Thomas Bareiß, at the system’s commissioning event. Image: Solarwatt.
15 September 2026
Berlin, Germany
Launching September 2026 in Berlin, Energy Storage Summit Germany is a new standalone event dedicated to Germany’s energy storage market. Bringing together investors, developers, policymakers, TSOs, manufacturers and optimisation specialists, the Summit explores the regulatory shifts, revenue models, financing strategies and technology innovations shaping large-scale deployment. With Germany targeting 80% renewables by 2030, it offers a focused platform to connect with the decision-makers driving the Energiewende and the future of utility-scale storage.

Read Next

July 29, 2026
RWE has launched construction on a 236MW/470MWh BESS in Germany, while IPP Kallista has done the same on a 193MW/386MWh system in France, supplied by Envision Energy.
Premium
July 28, 2026
In this deep-dive, we go through and analyse all of the technical features and claims of CATL’s new sodium-ion grid-scale BESS product, including its ‘millisecond-level self-healing’.
July 28, 2026
UK-based BESS and EV charging firm Zenobē has entered the German market with the acquisition of Bavaria-headquartered BESS developer SDP Energie.
July 24, 2026
In this news roundup, Grenergy, MaxSolar and Saft, and Amarenco have made significant advancements on BESS projects in Spain, Germany, and France.
July 23, 2026
Germany will have its first capacity market (CM) auction in September this year, following confirmation from the country’s energy regulator.