Australian trial for solar and storage consumers to profit from grid services

LinkedIn
Twitter
Reddit
Facebook
Email

A world-first for helping homes and businesses to optimise the value they get out of their PV and battery systems. Credit: ARENA
Australian tech company GreenSync is to trial a software-based marketplace where solar rooftop and energy storage consumers can trade their services with the local network operators to earn extra money.

The Australian Renewable Energy Agency (ARENA) is providing AU$450,000 funding for GreenSync to test its decentralised energy exchange (deX) project, in what it touts as a world-first for helping homes and businesses to optimise the value they get out of their PV and battery systems. Total project costs will be AU$930,200.

Phil Blythe, founder and CEO of GreenSync, said: “Homes and businesses will be able to monetise their solar and storage assets by essentially renting them to the grid when they’re most needed. deX will revolutionise peak electricity management and drive more effective investment in energy infrastructure,”

Australia already has a world-leading rooftop solar market, with high penetration amongst its population, but until now it has had no access to such a marketplace for consumers to trade their systems’ services.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Through the potential benefits of the deX model, ARENA hopes to attract more investment in solar and storage, while also making grid services trading the norm for utility operators.

GreenSync is using open-source software and collaborating with other technology businesses and start-ups to develop the deX marketplace. Partners include Reposit Power, Mojo Power, United Energy, ActewAGL, Australian National University, and the ACT and Victorian Governments.

deX was formed through ARENA’s ‘A-Lab’ initiative in April 2016.

Two trials

Utility ActewAGL will trial deX with batteries deployed in the ACT Government’s Next Generation Energy Storage Program. It will test how market-integrated batteries can alleviate grid constraints where the network is handling high levels of solar PV.

Another utility, United Energy, will be piloting deX in the lower Mornington Peninsula, where peak summer demand is expected to cause network constraints.

Opposition commits to 50% renewables

In more Australia news, opposition leader Bill Shorten has locked in federal Labor’s commitment to 50% renewable energy by 2030 at an event in Sydney.

However he cited continued policy uncertainty hampering renewables development in the country and confirmed that the Labor part would opt for an Emissions Intensity Scheme (EIS), as its mode of bringing in clean energy to gradually replace coal-fired power.

However, industry members have already questioned whether the EIS scheme will be effective.

3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

October 9, 2026
Finland is the Nordic region’s most-talked-about market for the moment, with project deals and other battery storage development activity from local and international players.  
October 9, 2026
Mint Renewables has received planning approval for an 800MWh battery energy storage system (BESS) near Kojonup in Western Australia.
October 9, 2026
Marinus Link held a sod turning ceremony in North West Tasmania to mark the start of expanded construction.
October 8, 2026
Eku Energy has signed CBAs with Gladstone Regional Council and Western Downs Regional Council for two BESS projects in Queensland.
October 7, 2026
EDF Power Solutions Australia has referred a wind-plus-storage project featuring an 800MWh BESS for assessment under Australia’s EPBC Act.