Lithium-ion dominates grid storage project proposals in 2014

LinkedIn
Twitter
Reddit
Facebook
Email

Lithium-ion (Li-ion) batteries accounted for 90% of all proposed grid storage projects in 2014, according to a new study by Lux Research.

The early mover status of molten salt batteries by companies like NGK Insulators means that technology still represents the most installed capacity, despite having now fallen out of favour.

Li-ion accounted for 419MW and 1,555 MWh of proposed storage systems in 2014. Molten salt batteries, primarily sodium-sulphur (NaS), represent 64% of deployed MWh, or approximately 1614MWh, up to January 2015.

“Driven by renewable-connected systems and demand management, grid-scale energy storage is taking off, with 450 MW and 730 MWh of systems installed in 2014 ,” said Dean Frankel, Lux research associate and the lead author of its ‘Grid Storage Data Tracker’.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

“As the market matures, new roles along the grid storage value chain are emerging – including financiers who enable leasing services to storage developers and their end-customers as well as battery operators who manage and control a systems’ role on the electric grid,” added Frankel.

The report also found that Japan and the US continue to have the lead in grid storage projects at present. Demand management and renewable energy connected systems are the leading applications for energy storage.

Main image: Flickr/Portland General

A grid-scale battery trial in the UK consisting of 3000 Li-ion batteries.

Read Next

October 7, 2026
US energy holding company and project developer-owner NextEra Energy has suspended operations at two energy storage facilities in Long Island, New York, US.
October 7, 2026
EDF Power Solutions Australia has referred a wind-plus-storage project featuring an 800MWh BESS for assessment under Australia’s EPBC Act.
October 6, 2026
Atmos Renewables has reached financial close on the 400MW/1,600MWh Teebar battery energy storage system (BESS) in Queensland, Australia.
October 6, 2026
IPP Linea Energy has closed a debt financing and preferred equity commitment for its 250MW/500MWh Mesa View energy storage project in Upton County, Texas, US.
October 6, 2026
Thermal energy storage (TES) technology provider Antora Energy has announced a 5.8GWh “multi-day” TES project at Pratt Energy’s biorefinery in Pratt, Kansas, US.