Italian oil giant acquires Australian solar-plus-storage project

LinkedIn
Twitter
Reddit
Facebook
Email

Eni Australia, a subsidiary of Italian oil and gas firm Eni, which has been active in Australia since 2000, has acquired a 33.7MW construction-ready solar-plus-storage project in the Northern Territory of Australia, from Katherine Solar, a joint venture between Australia’s Epuron and UK-based firm Island Green Power.

Once completed, the project near Katherine will be the largest PV farm in the Northern Territory and will include a battery storage system with a capacity of 5.7MVA/2.9MWh. A cloud coverage predicting technology will also be installed.

Construction is expected to start in the next few weeks, with an expected commercial operation date in Q4 2019. Epuron will help to manage the PV farm once it is operational.

This initiative marks Eni’s entry in the Australian renewables market. Eni Australia is already the operator and owner of the Blacktip Gas Project and has a non-operated interest in the Bayu-Undan gas and condensate field and in the associated Darwin LNG plant.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The hybrid project will contribute to the Northern Territory’s government goal to procure 50% of its energy from renewable sources by 2030.

Recently, a new 4MW / 8MWh energy storage project was also announced in an area of Queensland, which may also be soon getting a battery ‘Gigafactory’ before long.

3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

October 30, 2026
We’re back with another BESS Industry Buzz after a short period off, tracking interesting hot takes and analysis from across the energy storage industry.
October 30, 2026
Demand for 8-hour battery energy storage in Australia is “completely artificial” and relies on government underwriting, according to Tesla, which said asymmetric registration can help such projects earn more.
October 29, 2026
The California Energy Commission (CEC) has released over US$46 million for the state’s Distributed Electricity Backup Assets (DEBA) Programme.
October 29, 2026
Algorithmic bidding systems used to trade battery storage do not threaten competition in Australia’s NEM, according to Fluence.
October 28, 2026
CATL has launched its 9MWh TENER+ battery storage system at All-Energy Australia 2026 and signed three MoUs with Australian partners.