Italian oil giant acquires Australian solar-plus-storage project

LinkedIn
Twitter
Reddit
Facebook
Email

Eni Australia, a subsidiary of Italian oil and gas firm Eni, which has been active in Australia since 2000, has acquired a 33.7MW construction-ready solar-plus-storage project in the Northern Territory of Australia, from Katherine Solar, a joint venture between Australia’s Epuron and UK-based firm Island Green Power.

Once completed, the project near Katherine will be the largest PV farm in the Northern Territory and will include a battery storage system with a capacity of 5.7MVA/2.9MWh. A cloud coverage predicting technology will also be installed.

Construction is expected to start in the next few weeks, with an expected commercial operation date in Q4 2019. Epuron will help to manage the PV farm once it is operational.

This initiative marks Eni’s entry in the Australian renewables market. Eni Australia is already the operator and owner of the Blacktip Gas Project and has a non-operated interest in the Bayu-Undan gas and condensate field and in the associated Darwin LNG plant.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The hybrid project will contribute to the Northern Territory’s government goal to procure 50% of its energy from renewable sources by 2030.

Recently, a new 4MW / 8MWh energy storage project was also announced in an area of Queensland, which may also be soon getting a battery ‘Gigafactory’ before long.

Read Next

June 26, 2026
IPP Enlight Renewable Energy has announced that its US subsidiary Clēnera Holdings has entered into a debt financing framework agreement for the CO Bar Complex in Arizona, US.
June 25, 2026
US residential solar and energy storage installer Sunrun, energy management platform Renew Home, and Tesla have announced an agreement to deliver more than 16GW of flexible energy capacity to US hyperscalers and utilities.
June 25, 2026
AEMO has set out a storage requirement of almost 50GW in its latest 2026 Integrated System Plan (ISP), split between 35GW of short and medium-duration battery storage for daily firming and 5GW of long-duration energy storage (LDES) for seasonal reliability.
June 24, 2026
The Australian government has announced the results of Capacity Investment Scheme (CIS) Tender 8, selecting 15 battery energy storage projects across the National Electricity Market (NEM), totalling 4.2GW/16.1GWh.
June 23, 2026
Renewables developer rPlus Energies has announced start of commercial operations for the 400MW/1,600MWh Green River Energy Centre in Emery County, Utah, US.