IPP Lydian launches with 1.7GW US solar and BESS portfolio, backed by infrastructure fund Excelsior

By Jonathan Touriño Jacobo
April 11, 2024
LinkedIn
Twitter
Reddit
Facebook
Email

Minnesota-based independent power producer (IPP) Lydian Energy has made its official launch with a portfolio of 1.75GW of solar and battery storage projects in the US.

The initial portfolio currently consists of nine projects to be built in the US states of Texas and New Mexico. The company will specialise in the development, construction and operation of utility-scale solar PV and battery energy storage systems (BESS) projects across North America.

The IPP is backed by capital from renewables energy investor Excelsior Energy Capital, while its pipeline of projects will cater to commercial, industrial and utility customers.

Two of the solar projects – AC Ranch I and AC Ranch II – are in the pre-construction phase and have a commercial operation date (COD) of 2026-2027. Both projects will be built in the city of Hobbs, New Mexico, and have a capacity of 100MW (AC Ranch I) and 300MW (AC Ranch II).

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Currently three of the BESS projects have been unveiled and are located in Texas. All three have a COD of 2025 and are in the pre-construction phase. They have a cumulative capacity of 550MW/1.1GWh and 2-hour duration.

The technology used for either the solar PV or BESS projects has not been unveiled yet.

This story first appeared on PV Tech.

1 December 2026
Italy
Battery Asset Management Summit Europe is the annual meeting for owners, operators, investors, and optimisation specialists working with operational BESS assets across the continent. The Summit focuses on how to maximise performance and revenue, manage degradation, integrate advanced optimisation software, navigate evolving market and regulatory frameworks, and plan for repowering or end-of-life strategies. With insights from Europe’s most active storage markets, it equips attendees with practical guidance to run resilient, profitable battery portfolios as the sector scales.

Read Next

December 31, 2025
Anita Li, vice president of Jinko ESS, reflects on a ‘transformational year’ in which the energy storage arm of the vertically integrated solar manufacturer continued to expand.  
December 29, 2025
It’s been a bumper year for sponsored webinars here at Energy-Storage.news, and here is a selection to round out 2025.
December 24, 2025
In this Energy-Storage.news roundup,  Hydrostor receives permitting approval for its California project, Hawaiian Electric is set to begin construction on a Maui battery energy storage system (BESS) and Peregrine and Wärtsilä advance construction of a Texas BESS.
December 24, 2025
Our selection of Guest Blogs published over the past year continues, featuring entries from July to December.
Premium
December 23, 2025
Energy-Storage.news Premium speaks with CEO of optimisation platform provider Ascend Analytics, Dr. Gary Dorris, PhD, about navigating ERCOT’s revenue opportunities and the implementation of RTC+B.