India details compulsory new solar component quality standards

September 11, 2017
LinkedIn
Twitter
Reddit
Facebook
Email
Manufacturers will have to apply to the Bureau of Indian Standards (BIS) to obtain registration. Credit: MNRE

India’s Ministry of New and Renewable Energy (MNRE) has issued a new order seeking to improve the quality of components in the solar sector, including batteries to be used for stationary energy storage.

The ‘Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017’ is due to come into force 12 months after it was published in the government’s official gazette.

Manufacturers will have to apply to the Bureau of Indian Standards (BIS) to obtain registration and be able to use a new Standard Mark. All goods sold, stored, imported, manufactured or distributed will have to conform to the new specified standard.

Otherwise, defective or non-compliant goods will be “deformed beyond use and disposed of as scrap”.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The ruling will apply to modules, inverters and energy storage batteries. Samples shall be taken at least once every two years for each product or series of products. According to guidance issued by MNRE in April, this means energy storage batteries must comply with Indian Standard Number IS 16270: Secondary Cells And Batteries For Solar Photovoltaic Application – General Requirements And Methods Of Test published by the Bureau of Indian Standards in 2014.

Former power minister Piyush Goyal had issued a warning about quality to the industry at Intersolar Europe back in June, however, analysts at Bridge to India had said that the new standards would not be any tighter than those of the IEC. The only real change would be the inspections on site within India and the mandate to obtain an India-approved certification.

India’s attempt to brush off its sometimes tarnished reputation for quality projects was discussed in the most recent edition of PV Tech Power, just published.

Read Next

Premium
November 14, 2025
The US development arm of Milan, Italy-headquartered developer Nadara has encountered a setback in its pursuit of a 200MW hybrid BESS destined for Arizona.
November 13, 2025
Developer Acciona Energia will add a gigawatt-hour-scale battery energy storage system (BESS) at an existing solar PV plant in Chile.
November 12, 2025
India’s Adani Group has made its first entry into the battery storage market, announcing a ‘flagship deployment’ that will be the country’s largest project so far when completed.
November 11, 2025
Hassan Allam Utilities and Infinity Power have signed agreements with Egypt’s Ministry of Electricity and Renewable Energy and the Egyptian Electricity Transmission Company for two renewable energy projects in the country.  
November 5, 2025
India’s energy storage industry is at a turning point as developers, financiers, and policymakers work to define viable business models for the next wave of large-scale battery projects.