India details compulsory new solar component quality standards

September 11, 2017
LinkedIn
Twitter
Reddit
Facebook
Email
Manufacturers will have to apply to the Bureau of Indian Standards (BIS) to obtain registration. Credit: MNRE

India’s Ministry of New and Renewable Energy (MNRE) has issued a new order seeking to improve the quality of components in the solar sector, including batteries to be used for stationary energy storage.

The ‘Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017’ is due to come into force 12 months after it was published in the government’s official gazette.

Manufacturers will have to apply to the Bureau of Indian Standards (BIS) to obtain registration and be able to use a new Standard Mark. All goods sold, stored, imported, manufactured or distributed will have to conform to the new specified standard.

Otherwise, defective or non-compliant goods will be “deformed beyond use and disposed of as scrap”.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The ruling will apply to modules, inverters and energy storage batteries. Samples shall be taken at least once every two years for each product or series of products. According to guidance issued by MNRE in April, this means energy storage batteries must comply with Indian Standard Number IS 16270: Secondary Cells And Batteries For Solar Photovoltaic Application – General Requirements And Methods Of Test published by the Bureau of Indian Standards in 2014.

Former power minister Piyush Goyal had issued a warning about quality to the industry at Intersolar Europe back in June, however, analysts at Bridge to India had said that the new standards would not be any tighter than those of the IEC. The only real change would be the inspections on site within India and the mandate to obtain an India-approved certification.

India’s attempt to brush off its sometimes tarnished reputation for quality projects was discussed in the most recent edition of PV Tech Power, just published.

Read Next

March 19, 2026
In this US news roundup, updates on solar-plus-storage projects from Google and DTE Energy, Sunraycer, Invenergy and SRP, Idemitsu Renewables, and Clēnera.
March 17, 2026
The new edition of the UL9540A fire safety standard for battery energy storage systems (BESS) “establishes a new precedent in the testing and certification ecosystem.”
March 12, 2026
New Jersey’s regulator has approved the construction of battery storage facilities and a procurement for further energy storage resources in the PJM-connected US state.
March 11, 2026
Energy firm RWE added 2GW to its US operating capacity in 2025, bringing its total operational capacity to nearly 13GW across the country.
March 5, 2026
Developer Avantus has closed a financing package of over US$300 million for the 100MWac/130MWdc solar, 400MWh BESS Kitt Solar and Energy Storage Project in Pinal County, Arizona, US.