The Energy Storage Report 2024

Now available to download, covering deployments, technology, policy and finance in the energy storage market

Fluence wins ‘first full product ecosystem’ BESS project order, in Australia

LinkedIn
Twitter
Reddit
Facebook
Email

Developer Tilt Renewables has enlisted global system integrator Fluence for a 100MW/200MWh BESS project in Victoria, Australia, the first to deploy the full Fluence product ecosystem, the company said.

Tilt Renewables has enlisted the company to build, service and maintain the Latrobe Valley Battery Energy Storage System (BESS) under a 20-year service agreement.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The order from Tilt includes Fluence’s Gridstack BESS solution, its AI-powered bidding software Mosaic and its asset performance management software Nispera, which will optimise the BESS’ market trading and operational performance. Fluence acquired Nispera in April 2022.

The company said that Latrobe Valley will be the first privately funded storage project in Australia to be incorporated into an exclusively renewable generation fleet, and will also be the first to deploy all three products together.

“We are thrilled to work with Tilt Renewables to deliver the Latrobe Valley BESS, which is our first asset globally that will deploy the full Fluence product ecosystem. Tilt Renewables has been a long-term strategic customer for Fluence Digital, using Mosaic to optimise the market bidding of its wind portfolio since 2019, and we are honoured to extend and strengthen the relationship further with this energy storage project,” said Jan Teichmann, SVP and president, APAC (Asia-Pacific).

Many BESS projects today employ separate parties for the physical BESS solution on the one hand and the market optimisation on the other. The third-party BESS optimisation space has been covered in-depth by Energy-Storage.news recently, including comments from a Germany-based outfit Entrix on the market there and an interview with Habitat Energy, one of the leading players, a few weeks ago.

Tilt’s order is the second project for the Fluence in the Latrobe Valley, where it recently commissioned a 150MW/150MWh BESS at a former coal plant site for project developer Eku Energy and owner Engie.

Fluence also recently bagged several project orders in the UK market, from developer Varco Energy and independent power producer (IPP) Statkraft while securing its second Grid Booster project in Germany with a transmission system operator there in July.

Tilt Renewables is a developer and independent power producer (IPP) claiming to be the largest owner of wind and solar generation in Australia, while the Latrobe Valley project is its first BESS.

12 November 2024
San Diego, USA
As we see more storage projects become operational, the big question is “how to maximize your assets?” This event will prepare the industry for the road ahead, looking at the core fundamentals of asset management, understanding operational challenges, along with the latest optimization and software development. You can expect to meet and network with all the key industry players from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Read Next

June 11, 2024
A double-header of big news from Germany, with construction starting on a ‘Grid Booster’ BESS from TransnetBW and Fluence and the EU putting €58 million towards a project that will combine green hydrogen and iron flow battery storage at scale.
June 11, 2024
Editor Andy Colthorpe speaks with Yann Brandt, chief commercial officer at FlexGen, a solar industry veteran who saw the rising potential of the energy storage industry and jumped on board.
June 10, 2024
Australia’s Clean Energy Council has signaled that Q1 2024 saw signs of recovery for the nation’s renewable energy generation sector but warned that investment levels must radically increase to achieve 2030 decarbonisation targets.
Premium
June 10, 2024
Rachel Rundle of Eku Energy speaks to Energy-Storage.news Premium about the developer’s growing pipeline of battery projects in Australia.
June 5, 2024
Utility Octopus Energy will pay Gresham House Energy Storage Fund (GRID) a fixed fee to use half of its UK BESS portfolio, at a price which it said is ‘above the current merchant revenue stack’.

Most Popular

Email Newsletter