EIB approves US$64.8 million loan to support Northvolt’s European battery project

By Conor Ryan
LinkedIn
Twitter
Reddit
Facebook
Email
Sketch of the proposed demonstration line’s location. Image: Northvolt Twitter.

The European Investment Bank (EIB) has approved a loan request from Swedish start-up Northvolt that will see the bank provide a financing facility of up to €52.5 million US$64.8 million to support Northvolt’s pilot demonstration facility.

Northvolt is targeting the eventual development and construction of gigawatt-scale, ‘gigafactory’ manufacturing facilities for lithium battery production in Europe. After narrowing location down to two sites in Sweden, Västerås and Skellefteå in July last year, the company signed up ABB as a prospective technology supplier to the factory a short while after that.

The EIB financing will be supported by InnovFin – EU Finance for Innovators’ Energy Demonstration Projects facility — along with the financial support of the EU under Horizon 2020 Financial Instruments.

All involved parties are expected to finalise negotiations, with Northvolt expected to start construction of its demonstration line over the coming months. The demonstration facility will be used to show the the commercial viability of the concept and to qualify and industrialise products together with Northvolt’s customers. The batteries produced will be used in transport, stationary storage, and industrial and consumer applications.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The demonstration site, located in Västerås, Sweden, will also feature a research facility and will employ between 300-400 people. Launching this facility stands as another step towards Northvolt establishing its large-scale li-ion battery factory in Skellefteå — with the company eventually targeting a production of 32GWh battery capacity on a yearly basis.

Peter Carlsson, CEO of Northvolt, said: “Europe is moving rapidly towards electrification. Northvolt’s objective is to build the world’s greenest battery to enable the transition. With the support from the European Investment Bank and the European Union, we are now one step closer to establishing a competitive European battery manufacturing value chain.”

Vice President of the European Commission in charge of the Energy Union Maroš Šefčovič added: “Batteries are a strategic component of our competitiveness and to capture a new European market worth €250 billion (US$310 billion) annually as of 2025, we need to act fast. I therefore welcome the decision taken by the EIB, which will help this industry-led project take off the ground. It is important to pool all available instruments at the national and European level, such as InnovFin. The European Battery Alliance will continue supporting prospective partnerships throughout the value chain.”

24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

August 29, 2025
The Australian government has opened two CIS tenders in Western Australia, targeting 2.4GWh of energy storage and 1.6GW of renewables.
August 28, 2025
European Commission funding is supporting a project to integrate battery storage at a pumped hydro energy storage (PHES) plant in Slovakia.
August 27, 2025
An EU-backed energy storage capex support scheme in Lithuania will support as much as 4,000MWh of battery storage, the Ministry of Energy has said.
August 27, 2025
“Battery energy storage systems (BESS) typically change ownership between two and four times during their 40-year lifecycle,” John Sheehy, CEO of Pottinger, said on day two of the Battery Asset Management Summit Australia 2025 this morning.
August 26, 2025
After an initial rush to deploy that gave CAISO and ERCOT the lead in US BESS adoption, both markets are focused on capacity and availability, writes Amit Mathrani of Rabobank Americas.

Most Popular

Email Newsletter