EDF signs 20-year solar PPA with BESS option for Southern California Public Power Authority

By Will Norman
LinkedIn
Twitter
Reddit
Facebook
Email

EDF Renewables North America has signed a 20-year power purchase agreement (PPA) with the Southern California Public Power Authority (SCPPA) for its 117MW solar PV project in Riverside County.

The Sapphire Solar project is set to come online by the end of 2026 and will supply power to the cities of Anaheim, Pasadena and Vernon through their participation in SCPPA. The agreement also contains an option for SCPPA to access a 236MWh battery energy storage system.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

“Sapphire Solar will supply 117 MWac of solar capacity and a 59MWac/236 MWh battery energy storage system (BESS) to our growing renewable and energy storage resource mix,” said Michael Webster, executive director of SCPPA. “This project will help our Participating SCPPA Members meet and exceed renewable energy and resource adequacy requirements, while at the same time minimising costs and maintaining reliability.”

EDF renewables – a subsidiary of France’s state-owned EDF Group – has developed over 16GW of solar, storage and wind projects in the US. It recently signed a virtual PPA with McDonald’s for its 332MW Texas solar facility.

In California, the company connected a 475MW solar-plus-storage project to the grid last August, located on public land. The Sapphire Solar project will be situated on private land.

Riverside County also hosts EDF Renewables’ Desert Harvest I solar project which became operational in 2020. Solar plays a big role in California’s energy generation and transition framework, and will have to continue being installed at record rates if the state is to meet its targets over the next quarter-century.

This story first appeared on PV Tech.

17 June 2025
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 17-18 June 2025, will be our fourth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2026 and beyond.
1 July 2025
London, UK
UK Solar Summit 2025 will look at the role solar currently plays in the energy mix, how this will change over the coming years and how this aligns with net-zero and other government targets. We will break down all these challenges and help build up solutions through discursive panels, motivational keynotes and case studies, with newly added interactive sessions to get you moving and meeting your peers, making the connections you need to boost your business.

Read Next

March 14, 2025
A news roundup focusing on system integrator Powin’s recent moves in the industry, resource updates in New Mexico and a newly announced energy management system from Prevalon.
March 14, 2025
The Poland arm of UK-headquartered developer Harmony Energy has sold a 200MW/400MWh BESS project to EDF Renewables Polska.
March 13, 2025
Developer Cypress Creek Renewables has received a US$133 million financing from First Citizens Bank for the Destiny Storage Project, a standalone battery energy storage system (BESS) in Texas.
March 13, 2025
Carlyle Portfolio Company-owned developer Copia Power has closed a US$1.71 billion debt facility to fund construction of its Maricopa Energy Centre Projects.
Premium
March 13, 2025
Florida’s largest utility, Florida Power & Light (FPL), is ramping up its energy storage ambitions across the Sunshine State, with plans to deploy over 2.2GW of new BESS between 2026 and 2027.

Most Popular

Email Newsletter