EDF signs 20-year solar PPA with BESS option for Southern California Public Power Authority

By Will Norman
LinkedIn
Twitter
Reddit
Facebook
Email

EDF Renewables North America has signed a 20-year power purchase agreement (PPA) with the Southern California Public Power Authority (SCPPA) for its 117MW solar PV project in Riverside County.

The Sapphire Solar project is set to come online by the end of 2026 and will supply power to the cities of Anaheim, Pasadena and Vernon through their participation in SCPPA. The agreement also contains an option for SCPPA to access a 236MWh battery energy storage system.

“Sapphire Solar will supply 117 MWac of solar capacity and a 59MWac/236 MWh battery energy storage system (BESS) to our growing renewable and energy storage resource mix,” said Michael Webster, executive director of SCPPA. “This project will help our Participating SCPPA Members meet and exceed renewable energy and resource adequacy requirements, while at the same time minimising costs and maintaining reliability.”

EDF renewables – a subsidiary of France’s state-owned EDF Group – has developed over 16GW of solar, storage and wind projects in the US. It recently signed a virtual PPA with McDonald’s for its 332MW Texas solar facility.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

In California, the company connected a 475MW solar-plus-storage project to the grid last August, located on public land. The Sapphire Solar project will be situated on private land.

Riverside County also hosts EDF Renewables’ Desert Harvest I solar project which became operational in 2020. Solar plays a big role in California’s energy generation and transition framework, and will have to continue being installed at record rates if the state is to meet its targets over the next quarter-century.

This story first appeared on PV Tech.

Read Next

Premium
July 21, 2026
Energy-Storage.news Premium speaks with David Miller, CCO of Gridmatic, about the company’s latest report from CAISO.
July 21, 2026
Danish developer European Energy has reached financial close on the 80MWh Mokoan solar-plus-storage project in Victoria, Australia.
July 17, 2026
Battery energy storage systems (BESS) operating in California’s grid left approximately US$98 million on the table due to suboptimal bidding strategies, according to a new analysis from Gridmatic.
July 17, 2026
A subsidiary of Indian renewable energy equipment and component manufacturer Waaree Energies has opened a battery energy storage system (BESS) enclosure factory.
July 17, 2026
German solar and storage developer ib vogt has received state planning approval for the 120MW/480MWh Wagga North battery energy storage system (BESS) in New South Wales, Australia.