Australian trial for solar and storage consumers to profit from grid services

February 23, 2017
LinkedIn
Twitter
Reddit
Facebook
Email

A world-first for helping homes and businesses to optimise the value they get out of their PV and battery systems. Credit: ARENA
Australian tech company GreenSync is to trial a software-based marketplace where solar rooftop and energy storage consumers can trade their services with the local network operators to earn extra money.

The Australian Renewable Energy Agency (ARENA) is providing AU$450,000 funding for GreenSync to test its decentralised energy exchange (deX) project, in what it touts as a world-first for helping homes and businesses to optimise the value they get out of their PV and battery systems. Total project costs will be AU$930,200.

Phil Blythe, founder and CEO of GreenSync, said: “Homes and businesses will be able to monetise their solar and storage assets by essentially renting them to the grid when they’re most needed. deX will revolutionise peak electricity management and drive more effective investment in energy infrastructure,”

Australia already has a world-leading rooftop solar market, with high penetration amongst its population, but until now it has had no access to such a marketplace for consumers to trade their systems’ services.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Through the potential benefits of the deX model, ARENA hopes to attract more investment in solar and storage, while also making grid services trading the norm for utility operators.

GreenSync is using open-source software and collaborating with other technology businesses and start-ups to develop the deX marketplace. Partners include Reposit Power, Mojo Power, United Energy, ActewAGL, Australian National University, and the ACT and Victorian Governments.

deX was formed through ARENA’s ‘A-Lab’ initiative in April 2016.

Two trials

Utility ActewAGL will trial deX with batteries deployed in the ACT Government’s Next Generation Energy Storage Program. It will test how market-integrated batteries can alleviate grid constraints where the network is handling high levels of solar PV.

Another utility, United Energy, will be piloting deX in the lower Mornington Peninsula, where peak summer demand is expected to cause network constraints.

Opposition commits to 50% renewables

In more Australia news, opposition leader Bill Shorten has locked in federal Labor’s commitment to 50% renewable energy by 2030 at an event in Sydney.

However he cited continued policy uncertainty hampering renewables development in the country and confirmed that the Labor part would opt for an Emissions Intensity Scheme (EIS), as its mode of bringing in clean energy to gradually replace coal-fired power.

However, industry members have already questioned whether the EIS scheme will be effective.

17 March 2026
Sydney, Australia
As we move into 2026, Australia is seeing real movement in emerging as a global ‘green’ superpower, with energy storage at the heart of this. This Summit will explore in-depth the ‘exponential growth of a unique market’, providing a meeting place for investors and developers’ appetite to do business. The second edition will shine a greater spotlight on behind-the-meter developments, with the distribution network being responsible for a large capacity of total energy storage in Australia. Understanding connection issues, the urgency of transitioning to net zero, optimal financial structures, and the industry developments in 2026 and beyond.

Read Next

January 7, 2026
Western Australia has launched the fourth round of its Clean Energy Innovation Grants programme, prioritising long-duration energy storage.
January 7, 2026
Origin Energy has announced the commercial commencement of the 1,770MWh Eraring Battery 1 in New South Wales, Australia.
January 6, 2026
It’s our first week back to normal service so here’s a roundup of the past few weeks of BESS action in Europe, with projects moving forward in Romania, Denmark, UK, France, Spain, Albania, Germany and Austria.
January 6, 2026
The Australian Energy Regulator (AER) has confirmed that 244 community battery energy storage systems (BESS) are now connected to the country’s distribution networks.
January 6, 2026
In this blog, Kashish Shah, market development manager at Wärtsilä Energy Storage, argues that Australia’s complex battery storage market makes full-scope integration the most viable path for successful project delivery.