Australian gold mine will rent ‘storage-as-a-service’ to power operations

LinkedIn
Twitter
Reddit
Facebook
Email
Scotland’s Aggreko acquired German-American energy storage company Younicos in 2017. Image: Aggreko.

A megawatt-scale energy storage system will be rented out to power a gold mine in Western Australia by Aggreko, the mobile power solutions company which bought up energy storage provider Younicos last year.

Granny Smith gold mine, open since 1989 and operated by gold producer Gold Fields, will get an 8MWp solar PV array and a 2MW / 1MWh energy storage system which will be integrated with 24.2MW of existing natural gas generation capacity. As with all other Aggreko-Younicos projects since the takeover, the customer will procure the energy storage system under a rental contract.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The US commercial and industrial (C&I) market for energy storage, in particular, has started to see this type of “energy storage as-a-service” offering become more common, with the recognition that many businesses are not willing to pay the upfront capital cost for battery storage. Instead, such business models rely on the customer making savings on energy costs and the provider potentially earning some revenues from grid services, with the benefits shared between the two parties.

Aggreko said that the single service contract Gold Fields signed up to required no capital outlay from the customer, which Aggreko said eliminates technology risk, increases flexibility and ensures accountability over performance.

Construction will commence in May and is expected to finish towards the end of 2019. Fuel consumption at the mine could be reduced by 10% to 13%, with nearly all energy demand required for gold processing to be supplied by the hybrid power system.

The solar will reduce the need for thermal generation, while the battery will be used for a variety of applications, such as providing spinning reserve to local networks, ramp rate control for the PV plant and voltage and frequency support.

It’s the latest project to use a combination of solar and energy storage along with other generation and distributed energy management resources to help power mining operations, which are often energy intensive and remotely located in relation to grid networks. Recent examples reported by Energy-Storage.news include a 40MW hybrid solar, battery and heavy fuel oil plant at a gold mine in Mali, Africa which could offer around 40% energy cost savings to the facility and the addition of Ultra High Power lithium-ion nickel manganese cobalt (UHP NMC) batteries made by Kokam to natural gas generators at an off-grid site for Australian utility Alinta Energy.

Read Next

June 12, 2025
Renewable energy developer Acen Australia has received consent from the New South Wales IPC for a 640MWh wind-plus-storage project.
Premium
June 12, 2025
In this blog, ESN Premium speaks with Fluence’s Rob Hills and Sam Markham about hybrid assets and trends in Australia’s NEM.
June 11, 2025
Renewable energy developer ACEnergy has seen its 250MW Joel Joel battery energy storage system (BESS) in Victoria, Australia, granted its 5.3.4A notification.
June 11, 2025
The New South Wales government has stacked the incentives available for a solar and home battery energy storage system (BESS) should it connect to a virtual power plant (VPP).
June 10, 2025
Australia’s Victoria government has fast-tracked a 400MWh battery energy storage system (BESS) and 500MW solar-plus-storage project via its Development Facilitation Program (DFP).

Most Popular

Email Newsletter