‘A key technology’: Google to help fund non-lithium LDES projects in Arizona with SRP

September 10, 2025
LinkedIn
Twitter
Reddit
Facebook
Email

Tech giant Google has announced a partnership with utility SRP to help accelerate the commercialisation of non-lithium long-duration energy storage (LDES) technology.

The firm has partnered with Arizona utility Salt River Project (SRP) in what the companies described as a research collaboration to better understand the real-world performance of emerging non-lithium LDES tech.

Google will fund a portion of the costs for LDES pilot projects developed on the grid operated by SRP. The tech firm will also evaluate data on the pilot projects’ operational performance and provide input on the research and testing plans.

“We believe that long duration energy storage will play an essential role in meeting SRP’s sustainability goals and ensuring grid reliability,” said Chico Hunter, SRP manager of innovation and development.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

“Long duration energy storage is a key technology in the portfolio of advanced energy solutions that we want to bring to market faster—to unlock stronger, cleaner, more resilient grids,” added Lucia Tian, head of advanced energy technologies at Google.

“Through our collaboration with SRP, we aim to accelerate the innovation and technological advancements necessary to deploy LDES solutions at scale so communities in Arizona and beyond can meet their power needs reliably and cost-effectively for years to come.”

SRP and Google have already collaborated previously. SRP and IPP NextEra Energy Resources have together deployed two solar-and-storage projects, one with a 250MW/1,000WMh BESS that came online last year, which will feed Google’s data centres in Mesa, Arizona. Google is building a new facility there too, pictured above.

While also deploying or buying power from lithium-ion BESS projects like the above, SRP has also issued requests for proposals (RFPs) in 2024 and 2022 for non-lithium LDES projects. The results of the 2024 one are still to be announced while winners of the 2022 RFP include organic flow battery firm CMBlu.

Emphasis on non-lithium tech

The fact Google is funding as well as providing research assistance into LDES demonstrates it may see a clear need for the technology to power its own operations long-term.

It’s an interesting moment for LDES and the RFPs and above partnership’s emphasis on non-lithium tech is noteworthy.

Continued price falls for lithium-ion BESS have made it a real contender for LDES in the 8-12 hour range, and numerous guest blogs on Energy-Storage.news have covered this.

Lithium-ion OEM Envision Energy’s chief engineer Kotub Uddin gave an overview of how lithium-ion had become cost-effective for such durations in March, while Sightline Climate analyst Lukas Karapin-Springorum wrote yesterday on how this is now reflected in the technology mix of global LDES pipelines.

Last month, LDES Council CEO Julia Souder called for increased policy action to support LDES’ scale-up, though didn’t discuss technological details in particular.

Read Next

November 11, 2025
IPP Enlight Renewable Energy has secured a US$1.44 billion debt financing for the Snowflake A solar-plus-storage project in Holbrook, Arizona, US.
Premium
November 11, 2025
Japan’s NGK Insulators has discontinued its sodium-sulfur (NAS) battery product line, with the exit of its partner, BASF, thought to have led to the final decision.
November 10, 2025
A roundup of battery energy storage system (BESS) stories from the US including Fullmark Energy’s 130MWh BESS reaching commercial operations, Habitat optimising a 500MWh BESS for Ørsted, and Quino Energy securing US$10 million in Series A funding.
November 7, 2025
Developer-operator Plus Power has secured US$160 million in tax equity investments from Morgan Stanley for two battery energy storage system (BESS) projects in Massachusetts and Maine, US.
November 6, 2025
Developer-operator GridStor’s 220MW/440MWh Hidden Lakes Reliability battery energy storage system (BESS) project in Texas, US, is now operational.

Most Popular

Email Newsletter