Huawei signs MoU with GoldenPeaks for 500MWh of European grid-forming BESS

LinkedIn
Twitter
Reddit
Facebook
Email

GoldenPeaks Capital (GPC) and Huawei Polska have signed a Memorandum of Understanding (MoU) on a Battery Energy Storage System (BESS) cooperation focusing on 500MWh grid-forming BESS in Europe.

Under the MoU, Huawei says it will provide its All-Scenario Grid-Forming energy storage platform, with its safety standards.

GPC says it will further leverage its expertise and growth strategy in the Central and Eastern European markets, driving technology deployment and commercial operation and supporting the region’s ongoing energy transition.

The companies highlight that this collaboration comes during a “significant moment of global transition from classic energy structures accelerating into their transition to renewable energy.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The partnership aims to address grid stability issues caused by the rising share of renewable energy and its integration into the grid.

GPC will leverage the cooperation to offer technical support as part of its strategy to expand its presence in Poland, Hungary, and other countries.

In 2024, the company advanced its “2024 1GW Asset Target” by acquiring an additional 283MW of solar projects under construction.

In June 2025, it added another 54MW/216MWh BESS into its overall renewable portfolio, bringing the total RtB BESS portfolio to 392MW/1.6GWh.

All of these projects have obtained 17-year revenue guarantees through Poland’s capacity market auctions.

Grid-forming capabilities have been an emerging trend in European BESS projects.

In 2024, Germany-headquartered utility and independent power producer (IPP) RWE announced it would build a 7.5MW/11MWh BESS with grid-forming inertia capabilities in the Netherlands.

This year, RWE commissioned a 35MW/41MWh grid-forming BESS in the Netherlands.

In July, developer Merus Power commissioned a 38MW/43MWh grid-forming BESS in Lappeenranta, Finland.

Huawei’s Grid-Forming ESS solution has already been deployed at the Red Sea destination in the Middle East. It combines 400MW of PV capacity with 1.3GWh of energy storage, making it the world’s largest 100% renewable PV-plus-ESS microgrid, the company has claimed.

The system has also been implemented in Germany, Bulgaria, the Philippines, and China, supporting the company’s global deployment of its products and services.

Huawei has been banned from 11 5G networks in the EU, and the company’s products have been largely banned in the US since 2019.

Huawei’s newly announced MoU with GPC is also notable because part of a grid-forming BESS is the inverters in the system. There has been discussion of the company’s inverters also being banned in Europe.

Nathan Zhao, Director of Huawei Poland Digital Power, said of the MoU:

“Huawei Digital Power will support GPC’s energy storage strategy in Europe with All-Scenario Grid Forming capabilities and end-to-end high-quality standards covering R&D, production, and services, to jointly respond to the EU’s carbon neutrality goals.”

11 November 2025
San Diego, USA
The 2024 Summit included innovative new features including a ‘Crash Course in Battery Asset Management’, Ask-Me-Anything formats and debate-style sessions. You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.
24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

October 9, 2025
H.I.G. Capital-backed energy platform, Greenflash Infrastructure, has closed a hybrid tax capital and debt financing for Project Soho, a 400MW/800MWh standalone battery storage project in Brazoria County, Texas.
October 9, 2025
China-based inverter and BESS firm Sungrow has submitted its application for a Hong Kong Stock Exchange IPO, after a period of strong revenue growth.
October 9, 2025
Australia has announced the results of the fourth Capacity Investment Scheme tender, with 11.4GWh of solar-plus-storage contracts awarded.
October 9, 2025
Battery energy storage revenues in Australia’s National Electricity Market (NEM) fell 61% in September 2025 to AU$85,000/MW (US$56,712/MW) as price volatility eased across the grid, according to new research from Modo Energy.
October 8, 2025
US utility Xcel Energy has proposed to build out a 200MW battery storage network across Minnesota, US.

Most Popular

Email Newsletter