Premium

12.5GWh of grid-scale BESS commissioned in August, including largest single-phase LFP project ever

September 15, 2025
LinkedIn
Twitter
Reddit
Facebook
Email

China again dominated global battery storage deployments in August, accounting for two-thirds of what came online, but Europe, North America and Australia had good months too.

Total grid-scale battery energy storage system (BESS) capacity coming online last month across the globe totalled 3,979.51MW by power and 12,463.745MWh by capacity, an average duration of 3.1 hours.

The latest data from market intelligence firm Rho Motion’s Battery Energy Stationary Storage Monthly Database shows that monthly deployments fell to their lowest level since April, although the summer break may have played a role.

In the year-to-date, 122GWh of BESS has been deployed globally, up 28% year-on-year. That brings the total operational grid-scale capacity to 189GW/457GWh, fast approaching the gigawatts of installed pumped hydro energy storage (c.200GW) as we announced in last month’s roundup.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

China accounts for the majority again

April was actually the only month in which China did not account for at least half of the global figure, and its deployment frenzy shows no sign of slowing down.

A total of 2,472MW/7,949MWh came online in China in August, 64% of the global figure.

North America accounted for 15% with 513MW/1,832MWh, Europe 8% with 530MW/1,035MWh, and Oceania accounted for 11% with 357MW/1,403MWh. Oceania’s figure almost entirely came from one project in Australia.

Smaller deployments in the rest of Asia and South and Central America made up the remaining c.2% (the percentages are rounded).

Notable projects in China and Australia

The three largest projects on which commercial operations were announced in August were the:

  • China Huadian Wulumuqi Midongqu Beishawo Solar Base Standalone Energy Storage Project
  • Qingyang Huanxian Solar + Wind + Storage Project Phase I projects (both in China)
  • Phase two of the Collie BESS in Australia

The China Huadian project is a 1GW/4GWh system, which Rho Motion said is the largest single-phase lithium iron phosphate-based (LFP) BESS to enter operations in the world. Construction on it only started in Q1 2025, showing how quickly projects can be built in China.

The Qingyang Huanxian’s BESS is 323MW/1,291MWh while phase two of the Collie BESS, owned by independent power producer (IPP) Neoen, totals 341MW/1,363MWh. The combined phase one and two of Collie is 560MW/2,240MWh.

Notable large-scale projects also came online in the UK and France, while North America’s figure is likely in large part from a portfolio of projects in Oregon brought online by utility Portland General Electric (PGE).

Three non-lithium energy storage projects came online in August, Rho Motion said, the largest of these being a 100MW/400MWh flow battery project in China, the Poly Flow Chuxiong Lufeng Industrial Park Energy Storage Project.

Looking forward, the global project pipeline increased by 111GWh in August, bringing the total pipeline announced this year to 586GWh. The largest announced was the 8GWh Teeside GigaPark from developer Natpower in Redcar, UK, covered by our sister site Solar Power Portal.

This article is part of a monthly roundup for ESN Premium. See the previous ones here:

Read Next

April 1, 2026
Australian BESS face new financing reality as spreads halve to AU$100/MWh and lenders demand 50-70% contracting amid 15GW deployment surge.
Premium
March 31, 2026
Climate Energy Finance’s Tim Buckley argues that geopolitical instability exposes Australia’s oil dependency and positions the country as a safe haven for international renewable energy capital.
March 30, 2026
A 1.6GWh grid-forming battery energy storage system has received EPBC Act approval in Queensland, Australia.
March 27, 2026
Iberdrola has added its 360MWh Broadsound battery energy storage system (BESS) to AEMO’s Market Management System (MMS).
March 26, 2026
Shenzhen PowerOak New Energy Co., Ltd. (PowerOak), the fourth key player in the global portable energy storage sector, has submitted its IPO application to the Hong Kong Stock Exchange.