Ingrid/SEB and Monsson launching construction on Finland and Sweden BESS projects

LinkedIn
Twitter
Reddit
Facebook
Email

Ingrid Capacity and SEB have broken ground on a large-scale BESS in Finland, while Monsson has acquired a project in Sweden that it will start building in June.

Ingrid launches construction on Finland BESS project

Battery energy storage system (BESS) operator Ingrid Capacity and investor SEB Nordic Energy portfolio company Locus Energy have launched construction on a 70MW/140MWh project in Nivala, in the Northern Ostrobothnia region of Finland.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The 2-hour duration project is scheduled to go into operation in 2026. The project will be optimised with Ingrid Capacity’s proprietary trading platform which the company launched last year. CEO Axel Holmberg discussed this with ESN Premium last year.

Jussi Jyrinsalo, senior VP of transmission system operator (TSO) Fingrid commented: “This groundbreaking is an important moment for Finland’s energy transition and a concrete step toward a more flexible, resilient, and decarbonised energy system. We welcome Ingrid Capacity and Locus Energy’s contribution to our shared mission of enabling a reliable and renewable-powered grid.”

BESS are being deployed in Finland to capitalise on a profitable and growing ancillary services market, with much of the country’s renewable energy generation and future pipeline comprised of wind power. The country is targeting carbon neutrality on its grid by 2035. Earlier this month inverter and BESS firm Sungrow completed a 30MW/60MWh project in north Finland.

Ingrid Capacity and Locus Energy are both headquartered in Sweden and the Finland project follows collaboration on their home turf, with a 196MW/196MWh portfolio already under construction.

Monsson buys Sweden BESS from Neoen

In related news, independent power producer (IPP) Monsson has acquired a 60MWh BESS project in Sweden from fellow IPP Neoen, with construction set to be launched in June 2025.

The project is in Eskilstuna Municipality, Södermanland County in southern Sweden. The company has already been active in Sweden from wind farm operation and maintenance (O&M) services, and now intends to deploy over 200MWh of storage in the country.

Note that Neoen is also building larger BESS projects in Sweden, seemingly to operate itself, including the 93.9MW/93.9MWh Isbillen Power Reserve, set to come online this year.

Monsson will use its own BESS solution in Sweden, which the firm is also planning to use for a huge, 2GWh BESS in Romania.

The firm also has links to Sweden via its desire to deploy BESS using European-made technologies, which it claimed to have done for a 24MWh project in Romania in early 2024 – the inauguration of which was attended by Sweden’s ambassador to the country.

Enache told ESN Premium in an interview in May 2024 that, while in Romania it used battery technology from local firm Prime Batteries, in Sweden it could use batteries from lithium-ion OEM Northvolt. However, since then Northvolt has filed for bankruptcy in Sweden (in March 2025) with its assets currently for sale.

2 December 2025
NH Collection Vittorio Veneto, Rome, Italy
Across two packed days, the Summit focused on three core themes: revenue & trading, the lifecycle of the battery, and optimisation tools. Attendees explored innovative strategies for enhancing asset performance and longevity, with a spotlight on key markets like Germany, Italy, and the UK. Stay tuned for details on the 2025 edition of the Battery Asset Management Summit Europe, where we’ll continue to chart the path forward for energy storage asset management.
24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

Premium
June 19, 2025
We caught up with the CEO of Bulgaria-based International Power Supply (IPS) to discuss its claimed first mass-scale cell-to-system BESS manufacturing facility in Europe and its ultra-high density 20-foot product.
June 19, 2025
IPP R.Power Renewables will launch construction on large-scale BESS projects in Romania and Poland in the second half of this year, while Electrica is procuring EPC works for its own BESS project.
June 18, 2025
Developer Ilmatar and investor Nuveen Infrastructure have put a 30MW/41MWh BESS in northern Finland into commercial operation.
June 17, 2025
Power generation firm RWE has put a BESS in the Netherlands into commercial operation, its first that is capable of providing inertia to the grid.
Premium
June 16, 2025
The question of where the cells in a BESS are from ties in to safety, performance, design and, increasingly, potential tariffs.

Most Popular

Email Newsletter