Work begins on California solar-plus-storage project with 2,165MWh battery capacity

LinkedIn
Twitter
Reddit
Facebook
Email
The project is being built in Kern County, California, home to many of the state’s large-scale solar developments including the 121MW Springbok 3 project (pictured), which was completed in late 2019. Image: 8minute Solar Energy.

Renewable energy developer Terra-Gen has partnered with construction firm Mortenson to build what the pair claim is the world’s largest standalone solar-plus-storage project to date.

Called the Edwards & Sanborn energy project, it consists of 1,118MW of solar and 2,165MWh of energy storage in Kern County, which has become California’s unofficial large-scale solar capital due to the number of projects being built there.

Terra-Gen’s project will supply energy for “all hours of demand”, according to Brian Gorda, the company’s vice president of engineering.

The developer said it will break ground on the project in early 2021, and expects it to come online by the end of 2022. It will utilise more than 2.5 million solar and more than 110,000 lithium-ion battery modules.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

To read the full version of this story visit PV Tech.

Read Next

Premium
July 21, 2026
Energy-Storage.news Premium speaks with David Miller, CCO of Gridmatic, about the company’s latest report from CAISO.
July 20, 2026
Residential renewable energy solutions company Palmetto recently launched its Palmetto Energy Backup Plan, a residential battery subscription aimed at making residential storage more accessible in 25 US states.
July 17, 2026
Battery energy storage systems (BESS) operating in California’s grid left approximately US$98 million on the table due to suboptimal bidding strategies, according to a new analysis from Gridmatic.
July 16, 2026
Distributed energy resource (DER)-focused companies Sunrun and FranklinWH are expanding in California and Texas, US, respectively.
July 16, 2026
There’s been a flurry of project completions across Europe this past week, with projects completed in Germany, Estonia, Belgium, Denmark and Bulgaria by RheinEnergie/SMA, BSP, BStor, European Energy and Sunotec respectively, totalling nearly 700MWh of capacity.